Skip to main content
Skip to content
Case File
efta-01303089DOJ Data Set 10Other

EFTA01303089

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01303089
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
THEATER 3 THEATER EQUIPMENT WARNiNG 4 -X--;:c titigyp: Nos hack Se se My. YfRtR>Klydlf: No repanflor lama* dens win= :No mew nonce a saga dal 3I-May-19 Contractor's Name John Bedminster We have received proposals for demolition of the existing and construction 4 L 7 IC ).Pi of the new Little St. James Flag Pole Pool Cabana - Shaded Roof. There was quite a variance in the scopes so we have taken the liberty of listing what we expect from the contractor during this project. The list is as follows: 1. Prepare a working drawing. (Architectural quality is not necessary.) 2. General conditions shall be included as part of the line items (not separately). 3. Proposals shall have schedule of values based upon activities listed below: Demolition of Existing Roof Demolition of Existing Columns Demolition of Existing Tile Within Footprint Provide Dumpsters Located at Owners Direction (Barge for Dumpster Hauls Provided by Owner) Excavate & Pour 8 New Column Footings Form & Pour 8 New Columns Form & Pour Bond Beam (Alt. Steel Beam Acceptable) Strip & Remove All Formwork Frame Roof with 3"x8" rafters & 3"x10" hips 4/12 Pitch Install 2"x12" Fascia Board Around Roof Perimeter Install One Layer of 3/4" PT Plywood Decking to Rafters Install Ice & Water Shield to Plywood Install Copper Flashing/Drip Edge to Match Existing Install Concrete Roof Tile Install & Plaster Durock Ceiling Plaster All exposed Concrete Columns & Beams Install New Coral Stone Tile Per Owner's Instructions Working drawings 2,500.00 600.00 2,100.00 1,800.00 3,000.00 4,000.00 4,350.00 1,500.00 9,500.00 850.00 3,129.00 1,800.00 580.00 7,500.00 6,500.00 4,344.00 4,800.00 7,000.00 3,500.00 Should you have any questions or require additional Information please feel free to contact Bill Terry al Remember, this is a lump sum contract and any changes will hat to be signed by the contractor and owner. AVIS EPSON Pro 115051 `SDNY GM 00167998 EFFA_00191603 EFTA01303089

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.