Skip to main content
Skip to content
Case File
efta-01887321DOJ Data Set 10Other

EFTA01887321

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01887321
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: J EpsteinUeevacation©gmail.conl From: BMG Sent Mon 4/23/2012 1:15:40 PM Subject: Fwd: Re: Sent from my iPhone Begin forwarded message: From: Date: April 22, 2012 10:43:30 AM GMT-04:00 To: brice gordon Cc: A TOM MELNICK Daphne Wallace- Subject Good Morning to All, Please note below - changes/additionshtpdates. Daphne could you please update the Punch List to reflect these points, please call if you require more details Warmest regards always Karen On Sun, Apr 22, 2012 at 10:14 AM wrote: On Sat, Apr 21, 2012 at 4:35 PM wrote: 5 Palms - Desk to be sent from NYC - Sarah will make arrangements Outside Light Boxes on back & front walls to be covered over Lights - light Parrots and building - from roof line (retangler 24 x 10) lighting to be installed in ceiling - 4/23 Outside Coral stone seat - Brice will forward changes to Tom Retaining Wall requires layout Concrete Benches need placement Grade require flatten/building up Relocate grasses from Beach - JE will select location Generator Pad - 24th Mirrored Siding due on site 4/24 EFTA_R1_00304330 EFTA01887321 Cabinets/Shelves - to be completed by Bill Doors - will confirm delivery date 4/23 Fire Box - requires construction with Mexician Tile on floor area Painting - Final outside coat to be completed once all work as finished Level Dirt/Trees - 30th Grotto - Road to mimic Starfish Market Concrete pour 23th - complete 25th More dirt required on left hand side as you look down, then hydroseed Shutters/Generator Doors/Storage Doors - to be completed by John Flagpole Pool - Palm lighting starts 4/23 Bern - Crusher Runs, place inside Berm Area 50 Planter Boxes require construction - size to be determined by JE Relocate Tie Downs to Engineering Main Compound - Plant Goats Foot Vine on hillside Repairing of coral stone deck areas Coral Stone Threshold's in guests rooms need to be cut Table on dock - final size to be determined - to be completed by John coral stone top Dock - Redo entry. Brice to source dock wood locally Enginerring - Area needs to be leveled and metal shed to be laid out Old Floating Dock - move to high road EFTA_R1_00304331 EFTA01887322 Hanger - 2 x Queen Beds/Frames - purchase 4/26 Coconut Drawers, relocate to Hanger 4/26 Tel: Fax: Tel: Fax: Tel: Fax: EFTA_R1_00304332 EFTA01887323

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.