Case File
efta-01976576DOJ Data Set 10OtherEFTA01976576
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-01976576
Pages
3
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — November 13 2012
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- Lull — replacement parts — on site. Sub Boom Assembly ETA LSJ 11/16
3. Five Palms
- Picture frame — on site, 86 x 70 — Sarah forwarded 3 proofs for JE to review 11/8, will frame locally
- Wooden Bases — for sculptures — David — in production ETC 11/21
- Mirrored siding — continue to reglue as sections fall off, 2 sections off, area needs to dry before installation can be
completed
- Piano/Stool —to be relocated to hanger after visit
4. Grotto
- Mattress cover — completion delayed due to owner travelling to northeast — completion expected 11/14
5. Berm/Top of Hill
— Brice investigating a wood/paper combination material for hydro-seeding. Distributor found, sourcing material
- Pergola construction for high road benches — David — require design details/number from JE
6. Triangle
- Palms - relocated once Lull is repaired
- Gorilla — to be relocated to top of triangle once Lull is repaired
- Installation of lights — final light installation will be completed once Gorilla is relocated
7. Flagpole Pool Cabana
- Furniture — Desk - ETA STT 12/10
- Area Rug — JE requested 11/7 either soft white with black design or plain white extra soft rug - Sarah
- Pace clock — ordered 2 units due on site 11/8 delay due to Sandy ETA 11/14
8. LS1 Dock
- Dock box top & seat — Installed. Require more coats for UV Protection, which will be completed after visit
- Dock Carpet — David will install early Dec
9. Dock Boxes
- David will attempt to refurbish & replace all rotten lids & bases on existing boxes
10. Chillax Room
— Requires furniture piece for electrical/media equipment - Sarah forwarded another suggestion 11/13
11. Chillax Bathroom
- Walls in vanity area to be painted —1E to select color/style.
- Install Robe Hook on bathroom door —require location/height. Sarah has ordered correct hook 11/11
12. Boats
- Lady G — sell — will remain at Nanny Cay until sold. LV investigating selling in NJ
- Big N — rams/boxes installation & painting — complete. Hydraulic hoses installation & final electrical completion
expected 11/14
- Midnight Express — sell - LV investigating selling in NJ. Advertising locally
— Purchase New Dingy — sourcing locally
13. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
14. Transient Surge Protection, Blue Storage Bins & Safety Glasses —
Tropical shipped to Nassau in error, customer who received goods is refusing to return items. Awaiting claim forms
from Tropical. Per JE direction reordered 11/09
15. Old Floating Dock —
Break down and Dispose - begin 11/12
16. Landscaping— Peter's List
- Line all Roads with Rocks & Rocks for Waterfall —Top Priority
- Beach 3 — cleaned & graded - work to begin 11/14
EFTA_R1_00462783
EFTA01976576
- Rubbish Dump - regrade, bern placement along side road
- Transformer area on back high road — plant out
- Cutting Flowers/Vegs — Brice has purchased wide variety of seeds - planted 11/11
- Master Planter — JE to speak with Peter when he is back on duty
- Pop's Garden — electric fence — ETA STT 11/14
- David to make planter boxes — in production, 1 complete.
- Black Heli Under Pads — install at top of bike path at MC — Installation to begin 1/10
- Sea Grape — contacted PR sourcing prices expected 11/14
- 20 x 15ft Coconut Palms — for engineering area — ordered 11/9 ETA L.5112/1
17. Roads
- General re-grading of roads — ongoing — Peter
- JE requested investigating surfaces that can handle the weight of the heavy equipment
18. Library
- AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will
answer concerns & develop control designs, EDA 11/16
19. New Employee Bathrooms
- research "outhouse "option
20. Gym
- Old Punching Bag to be reinstalled — complete 11/13
- Glass front fridge on site 11/15 to be installed — David to trim out location
- Ballet Room Windows — chipped. Opener needs gluing — will complete after visit
21. Beach Office
- complete electrical overall required
- waterproofing/sealing/replace rotten wood —Complete
- painting in progress ETC — 11/16
22. LSJ Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP
23. Hangar
- Fuel Containment Pad —
24. Steel shed — ETA Tropical shipping 12/3, sailing 12/5 ETA STT 12/8 Container will be emptied on LSJ & stored until
installation crew on site, Construction crew ETA 1/11
- JE requested extra metal sections & roller door to old engineering area — need to approve layout will forward 11/14
- Installation of new bolts — David. Due on site 11/14
25. Equipment/Household Purchase and Delivery
- (3) Terex RL-4000 6kW Light Tower systems — 2 on site, 1 remaining to be picked up 11/16
- (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — ETA LSJ 11/16
- (1) 2003 Genie Z60/34 Boom lift — EDA Tropical by 11/8 ETA Sailing 11/26
- (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — awaiting buckets from UK, one received by vendor, 2nd due
to vendor 11/16 ETA Tropical 11/19 ETA STT 11/25
- Yellow Black Assort Life Jackets — ordered 11/13
- Floating Pool Mats — for ocean & pool — ordered 11/7 awaiting shipping details
- 20ft Floating Trampoline — ordered 11/7 ETA Tropical 12/29
- Italian Deck Chairs — awaiting shipping/delivery details
- Extra Restoration Hardware Cushions ordered 11/10 awaiting delivery date
- L51 Mats — for all locations Logo approved 10/16 — in production — EDA STT 11/23
26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired
27. Stone Walls
— Repair work to replace missing loose stones — Gerry & T1 working as time permits
- Complete Heli Pad Wall — sub contractor forwarded bid 11/12 scope of work & more details required, awaiting
revised bid
28. Part Time Employees — interview scheduled for 11/16
29. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ETA STT 11/13
EFTA_R1_00462784
EFTA01976577
30. Cisterns — need to be cleaned /sealed. Bid approved 11/8 Work to start after 1/10 expected completion by 11/18
then back to complete the Great Room cistern early Feb
31. Solar —Solar lights to be placed everywhere
• New Solar Vendor on site 11/8 will forward a proposal within 14 days
32. Movie Screen — investigating purchase Stewart Screen & new Blue Ray DVD Player — will review with Larry while on
site 11/141
33: Pebble Beach House — fan ordered 11/8 - ETA NYC 11/23 to be brought down on plane
EFTA_R1_00462785
EFTA01976578
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishRelated Documents (6)
Dept. of JusticeAug 22, 2017
15 July 7 2016 - July 17 2016 working progress_Redacted.pdf
Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith Hello Warden Smith, mother is anxious to hear the results of your inquiry into her daughter's health. I'd be grateful if you could email or call me at your earliest convenience. I'm free today after 2 p.m. Alternatively, we could meet after the Prison Board of Inspectors Meeting this coming Thursday. Best wishes, Janet Irons 1 Kristen M. Simkins From: Sent:
1196p
DOJ Data Set 10OtherUnknown
EFTA01757754
8p
DOJ Data Set 10OtherUnknown
EFTA01527340
8p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01656066
0p
DOJ Data Set 10OtherUnknown
EFTA01743996
3p
DOJ Data Set 10OtherUnknown
EFTA02031434
31p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.