Skip to main content
Skip to content
Case File
efta-02017539DOJ Data Set 10Other

EFTA02017539

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-02017539
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —July 15 2012 Directives 1. Clean Up - Top Desal Plant - Engineering - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment — updated list forwarded 7/10 - Buy new Kawasaki bikes and mules — Rich K negotiating with Vendor - Kawasaki Parts order submitted twice — awaiting direction 3. Computers - Buy new computers — 2 Macs Desktops & 1 Laptop — Captains Office. Ordered 4. Five Palms Internet/Phone Switch on site, Jermaine to start install 7/16 - Phone set up left of desk — ready for switch - Wireless inside only — as of date 7/10 via JE - Computer — as of date 7/10 not required via JE - Exterior Door Shutters — estimate forwarded to JE 7/12 - $2,865.00 awaiting direction - Painting - outside to be completed via JE direction - inside to be completed via JE direction - Furniture — outside furniture ordered — due to ship to Tropical 7/13 - Piano Bench — ETA 7/16 - Picture Frame — measurements forwarded t 6 x 70 - Mirrored siding — liquid nails — will cover entire panel with glue when the next one falls off - Tapestry Molding for Ceiling — Ion - Transformer Protection Wall — work to begin 7/20 - Floor Gold Lamps - electrical wiring needs to be replaced, completion expected 7/20 5. Grotto - Floor resin white — COMPLETE will reset furniture 7/17 after curing - Genset wiring — wiring complete Danny reviewing auto start from Kite House 6. Berm/Top of Hill - Electrical — Low voltage transformer in place, placement & connection of lights completed ASAP - Main Transformer onsite installation to begin 7/16 - Concrete Band — require confirmed mark out via JE 7. Engineering/Maintenance Yard - Steel Shed Concrete Pad — COMPLETE - Metal Sheets - on old building replaced - work to begin 7/18 - Painting — power sanding/rust removal continues - Engineering Storage & Shelving — work started 7/13 - Landscaping — Quote for Seagrapes forwarded to JE 7/12, awaiting direction 8. Triangle - - Landscaping direction required from JE 9. Flagpole Pool Cabana - - Furniture — Investigate new desk, new furniture more like Pool Cabana PBI - Relocation of orange sofa to Media Room 10. Floating Dock - Jetski Bumpers — Ordered - ETA 7/24 - Table/Dock Box — Sample handles complete, JE requested larger, will forward new samples by 7/18 - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Wooden Bumpers — to cover concrete stripping — COMPLETE EFTA_R1_00521120 EFTA02017539 - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE 11. Entry Tree Lights — Lights on site, electrical installation completion 7/20 12. Solutions for Generators — Soundproofing Installation — to be completed 7/20 13. Tiki — Shields have been shipped awaiting arrival at Tropical 14. Kite House — relocation of outside furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Chillax Bathroom - require blue rugs for bathroom & vanity area -- 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G — sell - will be placed in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N - sell 19. Timers — review installing timers on air conditioners, irrigation water systems, and lights 20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 21. Transient Surge Protection —will review and forward estimate ASAP - Danny 22. Ice Maker — ordered 6/21 ETA 7/20 23. Landscaping —Soil Material on site. Soil to be removed from beds 7/16 24. Solar lights — Ordered, placed every 30 feet. Due to leave Tropical 7/20 25. Roads — grade - Jules work continues 26. Library - Lights on bookshelves need attention — will complete ASAP - Temperature - STABLE 27. Main hill — Asphalt path — top and bottom to be completed by JE's direction. Will start 7/19 28. New Employee Bathrooms 29. Gym - New punching bag — ordered due 71" 7/16 - Wiring — Balance Cables on site final tidy up due to be completed 7/17 30. Benches 31. Danny Vicars — schedule boat driving lessons 32. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood required 33. LS1 Mooring — Darren will forward to Army Corp for final approval — 7/12 34. AYH Dock — Resending/Staining of Nana Dock - COMPLETE 35. Cistern MC — Demo work complete, confirmed multi leaks. Repair work required 36 .Hangar - Jermaine to redo internet at hangar - Fuel Containment Pad — draft approved with drainage incorporated, waiting for updated plan EFTA_R1_00521121 EFTA02017540

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.