Case File
efta-02353028DOJ Data Set 11OtherEFTA02353028
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02353028
Pages
3
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Leighton Allenby <
>.
Sent:
Friday, July 31, 2015 4:23 PM
To:
Jeffrey Epstein; Richard Kahn
Cc:
Bill Hague; Anna Rodriquez
Subject:
Re: LSJ Plate Work
Hello Anna and Bosco=,
Can you please go over every inch of Big D and determine when =he bleeding to Mr. Epstein is going to stop.
I know I am coming =n late in the last quarter but there should have been a survey recommended=so this
additional work outside of the original budget did=e39;t occur and a 10 to 15% mic added for unforeseen. I see
no other optio= but to
recommend to Mr. Epstein and Richard that this
Mr. Epstein and Richard,
I this additional $47,390 expenditure=approved?
cant color="eff0000">Best,
Leigh=on
Good Morning Anna-
Upon reviewing and inspecting the=inside of the compartments, forward of the engine room, we have
come up wi=h a quotation
for repairing all the "wasted" plate. Ap=roximately 160 square feet of plate has to be cut out and
replaced. The sq=are footage equals
848LBS x $45 per pound the total would be $38=160 (This price includes all labor and material). We will
also have to rem=ve both keel
coolers due to their location with the plate that h=s to be cut out. We will also have to fabricate two
new boxes in which the= sit and
then remount these boxes once the new plate is we=ded into place. The price for this is $5850 includes
labor and material. T=o water
tight bulkheads are also compromised and several a=eas will need to be "cropped" out and replaced.
Labor and materi=ls is $3380.
We will also "plug weld" 12 more ad=itional areas that have deteriorated and need to be addressed.
These two c=mpartments have
been inspected by both Gabriel, the projec= manager, and Bosco. In addition, the emergency bilge
pump system nee=s to be renewed
and it is our recommendation to have =osco undertake this job. Please note that we have not charged
any addition=l lay days and
will continue not to. The areas that need t= be cut out and replaced are very confined and difficult to
work in.=C2*With the savings on lay
days it is over $3500 so=we will not be able to move on our final quotation. I have also attached a=few
pictures
Total f=r labor and material
$47,390
<=div>
EFTA_R1_01333192
EFTA02353028
Leighton Allenby</=ont>
Director of =roperties
On Fri, Jul 31, 2015 at 11:43 AM, Ann Rodriq=ez <
<mailto:
> wrote:
Ann R.<=cliv>
Begin forwarded message:
From: gene kral
= target=>
Date: July 31,=2015 at 11:19:19 AM AST
To: Ann Rodriquez st
> >
Subject: Fw: LSJ Plate Work
Reply-To: gene kral &l=;
Good Morning Ann=-
Upon reviewing and inspecting the inside of the compartments, =orward of the engine room, we
have come up with a quotation for repairing =11 the "wasted" plate. Approximately 160 square feet of plate ha= to be cut
out and replaced. The square footage equals 848LBS x $45 per po=nd the total would be $38,160 (This price includes all
labor and material)= We will also have to remove both keel coolers due to their location with =he plate that has to be
cut out. We will also have to fabricate two new bo=es in which they sit and then remount these boxes once the new
plate is we=ded into place. The price for this is $5850 includes labor and material. T=o water tight bulkheads are also
compromised and several areas will need t= be "cropped" out and replaced. Labor and materials is $3380. We=will also
"plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have
been inspected =y both Gabriel, the project manager, and Bosco. In addition, the emer=ency bilge pump system needs
to be renewed and it is our recommendation40=A0to have Bosco undertake this job. Please note that we have not
charged a=y additional lay days and will continue not to. The areas that need to be =ut out and replaced are very
confined and difficult to work in. =ith the savings on lay days it is over $350O so we will not be able t= move on our final
quotation. I have also attached a few pictures
Total for labor and material.=
$47,390
<=mg width="423" height="238" alt="Inline image 7" src="cid:ii_14ee4r8f47c3b9d2">
=/blockquote>
2
EFTA_R1_01333193
EFTA02353029
<1=iv>
3
EFTA_R1_01333194
EFTA02353030
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2353028Phone
2353029Phone
2353030Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.