Skip to main content
Skip to content
Case File
efta-02353028DOJ Data Set 11Other

EFTA02353028

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02353028
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Leighton Allenby < >. Sent: Friday, July 31, 2015 4:23 PM To: Jeffrey Epstein; Richard Kahn Cc: Bill Hague; Anna Rodriquez Subject: Re: LSJ Plate Work Hello Anna and Bosco=, Can you please go over every inch of Big D and determine when =he bleeding to Mr. Epstein is going to stop. I know I am coming =n late in the last quarter but there should have been a survey recommended=so this additional work outside of the original budget did=e39;t occur and a 10 to 15% mic added for unforeseen. I see no other optio= but to recommend to Mr. Epstein and Richard that this Mr. Epstein and Richard, I this additional $47,390 expenditure=approved? cant color="eff0000">Best, Leigh=on Good Morning Anna- Upon reviewing and inspecting the=inside of the compartments, forward of the engine room, we have come up wi=h a quotation for repairing all the "wasted" plate. Ap=roximately 160 square feet of plate has to be cut out and replaced. The sq=are footage equals 848LBS x $45 per pound the total would be $38=160 (This price includes all labor and material). We will also have to rem=ve both keel coolers due to their location with the plate that h=s to be cut out. We will also have to fabricate two new boxes in which the= sit and then remount these boxes once the new plate is we=ded into place. The price for this is $5850 includes labor and material. T=o water tight bulkheads are also compromised and several a=eas will need to be "cropped" out and replaced. Labor and materi=ls is $3380. We will also "plug weld" 12 more ad=itional areas that have deteriorated and need to be addressed. These two c=mpartments have been inspected by both Gabriel, the projec= manager, and Bosco. In addition, the emergency bilge pump system nee=s to be renewed and it is our recommendation to have =osco undertake this job. Please note that we have not charged any addition=l lay days and will continue not to. The areas that need t= be cut out and replaced are very confined and difficult to work in.=C2*With the savings on lay days it is over $3500 so=we will not be able to move on our final quotation. I have also attached a=few pictures Total f=r labor and material $47,390 <=div> EFTA_R1_01333192 EFTA02353028 Leighton Allenby</=ont> Director of =roperties On Fri, Jul 31, 2015 at 11:43 AM, Ann Rodriq=ez < <mailto: > wrote: Ann R.<=cliv> Begin forwarded message: From: gene kral = target=> Date: July 31,=2015 at 11:19:19 AM AST To: Ann Rodriquez st > > Subject: Fw: LSJ Plate Work Reply-To: gene kral &l=; Good Morning Ann=- Upon reviewing and inspecting the inside of the compartments, =orward of the engine room, we have come up with a quotation for repairing =11 the "wasted" plate. Approximately 160 square feet of plate ha= to be cut out and replaced. The square footage equals 848LBS x $45 per po=nd the total would be $38,160 (This price includes all labor and material)= We will also have to remove both keel coolers due to their location with =he plate that has to be cut out. We will also have to fabricate two new bo=es in which they sit and then remount these boxes once the new plate is we=ded into place. The price for this is $5850 includes labor and material. T=o water tight bulkheads are also compromised and several areas will need t= be "cropped" out and replaced. Labor and materials is $3380. We=will also "plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have been inspected =y both Gabriel, the project manager, and Bosco. In addition, the emer=ency bilge pump system needs to be renewed and it is our recommendation40=A0to have Bosco undertake this job. Please note that we have not charged a=y additional lay days and will continue not to. The areas that need to be =ut out and replaced are very confined and difficult to work in. =ith the savings on lay days it is over $350O so we will not be able t= move on our final quotation. I have also attached a few pictures Total for labor and material.= $47,390 <=mg width="423" height="238" alt="Inline image 7" src="cid:ii_14ee4r8f47c3b9d2"> =/blockquote> 2 EFTA_R1_01333193 EFTA02353029 <1=iv> 3 EFTA_R1_01333194 EFTA02353030

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2353028
Phone2353029
Phone2353030

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.