Skip to main content
Skip to content
Case File
efta-02381961DOJ Data Set 11Other

EFTA02381961

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02381961
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Brice Gordon <[email protected]> Sent: Sunday, September 13, 2015 5:35 PM To: jeffrey E. Cc: Rich Kahn; Zorro Ranch Subject: Re: ZDC PB and Log Cabin =div class="gmail_default">Jeffrey E. 12:00 AM (11 hours ag=) to me, Richa=d h=w long to make level with the plan i produced originally for grading= i assume much of the work can get done whetehr you are there are no=. i will come out late october . to mark out beds= so i hope grading finshed by then <=iv class="gmail_default">Jeffrey <=div> Anticipate completion of Log Cabin last w=ek of September, and then planned to re mobilize to MH Project E mail and Photos of progress at Log Cabin to follow=/div> W= will try to meet that deadline, <=r> Reminder its a 9 plus foot retaining =all, backfill for 80 percent of area involved, compaction, An issue th=t needs to be addressed, Drainage,=under the present plan/grade, in the event of a down pour proposed path ma=erial and small landscape walls will get washed away regards Brice <=iv class="gmail_default" style="font-size:small"> On Wed, Sep 2, 2=15 at 11:26 AM, Zorro Ranch <[email protected] <mailto:[email protected]> wrote: Ok Confirm=ng we will concentrate on log cabin until we get design confirmation for N=w garden at main house Thank you Brice =A0 Sent from my iPhone On Sep =, 2015, at 10:58 AM, jeffrey E. <[email protected] <mailto:[email protected]=> wrote: do not hold off. her visi= is not very important to me EFTA_R1_01397718 EFTA02381961 On Wed, Sep 2, 2015 at 12:11 PM, Brice Gordon <[email protected] <mailto:[email protected]» wrote: Jeffrerldiv> Staging material, rocks =nd dirt at the log cabin have scheduled for today and tomorrow I intended to hold off on =ny other work at that location until after Linda's visit 14th Sept We have been stock piling di=t for back fill and grade MH, unfortunately the track hoe broke down =div class="gmail_default" style="font-size:small">lt has been returned= company was unable to locate part. Another unit has been found from another compan=, we are waiting for confirmation on delivery date, Monday or Tuesday next=week. In the mean time t=e access road behind the MH to proposed new site needed work and a slight =hange of layout so dump truck was not continually driving over Spetic Tank= located to the South East of Mechanical Building. The storm water pipping from t=e MH that goes under this road also need work, this work has been complete=. </=iv> I will send Phot=s Friday of progress reg=rds Brice Brice Gordon Stanley, NM =br> Ph: ctel:%28505%29%20934%202809> =/div> =C2 please note The informat=on contained in this communication is confidential, may be attorney-cli=nt privileged, may constitute inside information, and is intended only =or the use of the addressee. It is the property of JEE Unauthoriz=d use, disclosure or copying of this communication or any part thereof =s strictly prohibited and may be unlawful. If you have received this return e-mail o= by e-mail to [email protected] <mailto:[email protected]> , and 2 EFTA_R1_01397719 EFTA02381962 destroy this communication and all copies =hereof, including all attachments. copyright -all rights reserved </=iv> Brice Gordon Stanley, NM Ph: 3 EFTA_R1_01397720 EFTA02381963

Technical Artifacts (9)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.