Skip to main content
Skip to content
Case File
efta-02382049DOJ Data Set 11Other

EFTA02382049

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02382049
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lvjet Sent: Monday, November 28, 2011 3:12 AM To: [email protected] Subject: 6727 update Jeffrey, Terak from Qatar told me that his chairman will be in West Palm Beach =n December 3rd to view the Boeing 727 and possibly take a demo flight= Chicago was mentioned as a possible destination. No firm demo flight date=has been established. I will gain your approval first,. I will have more info early this week,. Don Bass and Terak requested a=4 year maintenance budget from Larry Morrison,. here is the email that Morrion prepared,. It has not been sent to buye=,. only fwd to Don Bass, at this time,. Dear Don, Per your request, and as follow up to our teleconference last week, pl=ase see the following maintenance projections. While reviewing, please kee= in mind that these are only projected estimates, and do not include line =aintenance and normal wear items. As well, keep in mind that these project=ons are based on average findings and do not include extenuating circumsta=ces. January 2012: C 2C Check (General De=cription: Inspection Below Galleys, Lavatory's and Emergency Exits, Fore a=d Aft Wing Spars) Estimated Cost: $420,000 3 weeks down t=me February 2013: Lower Lobe and Bilge Inspectio=: (General Description: Requires removal and installation of Aux.=Fuel Tank System / History of this aircraft has had minimal findings in th=se zones, however, the removal and installation of the tank system is Iabo= intensive, 36mo. recurring). $300,000 3 weeks down time =note: all eleven fuel cells were overhauled at last removal, thus cell con=itions should be good) . Engine No.2 HPC AD2003-12-07 (amd. 39-13192) (8 yr re=urring) (Due 7/27/2013) $350,000.4 weeks down time (howe=er there are exchange options available for the -7B engine). February 2014: C Check (General Desc=iption: Two year items) Estimated Cost $175,000 2 weeks d=wn time. Engines No.1 and No,3 HPC AD 2003-16-05 (amd.39-=3258) (9 yr recurring) $350,000 each, 4 weeks down time (=ote: Lease as well as exchange engines are difficult to come by do to inte=mediate case modifications required for the Super 27. In addition exchange=engines are not recommended do to the very low hours and cycles on the cur=ent set of engines). I hope this helps to define the upcoming major maintenance events for =9081E. Once the 2014 Maintenance is complete the aircraft will be back on =chedule with the MSG3 multiple of two program. In essence, all subsequent =hecks will be every 24 months, the following being 2016. Best Regards, Larry Morrison Director of Maintence / JEGE Inc. EFTA_R1_01397842 EFTA02382049

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2382049

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.