Skip to main content
Skip to content
Case File
efta-02425620DOJ Data Set 11Other

EFTA02425620

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02425620
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffre E tein 'eevacation mail.com Cc: Fran: Gary erney Sent: Fri 5/7/2010 7:17:27 PM Subject: minutes of 5/6'10 Agenda visit 5/6/10 WITH MINUTES 5/7/10 Master suite 1. Shower/steam design RECIEVED FINAL PLANS 2. white lassos in steam/shower a.white glass in dressing room cost $ 55,000 5 months lead time plus install and shop drawing time b.Tassos in dressing room cost $ 30,000 2 months delivered and installed SEE 1 3.tub and room design DESIGN PENDING 4.arch openings between bed and bath KEEP 5.wood flooring design, coral gone on dressing room floor SEE 1 6.treatment of bedroom walls PLASTER THEN ROBERT WILL DECIDE ON FINAL 7.door review? ROBERT TO FORWARD PLAN MAY CLOSE OFF DOORS ON WEST 8.tv location SEE 8 Library courtyard design GAVE ROBERT AS BUILTS AND REVIEWED ALTERNATIVE MATERIALS TO MAKE DESIGNS Kitchen EFTA_R1_01494020 EFTA02425620 1. interior design SENT CAD DRAWINGS TO ABRAM,AND WENT OVER FUNCTION WITH BRICE, ROBERT TO PRODUCE DESIGN DRAWINGS 2.COLUMN DECISION ROBERT TO DO TWO OR THREE ALTERNATIVES IN PHOTO SHOP GARY TO PRICE 1 KEEP ARCHES WITH PLASTER COLUMNS 2 KEEP ARCHES WITH PLASTER COLUMNS AND STONE BASE 3 REMOVE ARCHES AND NEW STONE COLUMNS -Cottages 1. Door approval DONE 2. Shower decision a.fully enclosed stone and tiled, seems to tight to me b.collum plus roof and screen seems right ROBERT TO SKETCH UP PLAN ,GARY TO PRICE 3.Abram gave us direction on elect. how about TV?data ect. 4.design for vanities to replace pedestal sinks and any change to bath rooms(currently none in budget) ROBERT TO FORWARD PLAN/SPEC Site 1.review wall progress 2.Get everyone thinking about walk from kitchen to master to library WE REVIEWED THE SKETCHES AND ROBERT TO REFINE PLAN Gensler WE REVIEWED ROBERTS PLAN FOR THE THEATER /POOL AND HE WILL REVISE AND FORWARD TO ME TO STAKE OUT CZM Deionah Jeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and indoor pool with Robert and you together EFTA_R1_01494021 EFTA02425621

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainmail.com
Phone2425620
Phone2425621

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.