Skip to main content
Skip to content
Case File
efta-02430091DOJ Data Set 11Other

EFTA02430091

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02430091
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epstaiiiii Cc: Gary Keme From: Stephen Caplinger Sent Wed 2/17/2010 1:13:08 PM Subject: Large Palms For replacing the large Phoenix Dactyliferas, I've been working with Randy Melvin and they are available in Arizona or California, however the Arizona ones are probably better (I'll send photos when available). They all would be matched and we could get 25' or 30' or whatever size you wanted. The 30' clear trunk palms would be $7,500 each planted. We would need to tag the exact ones we want and then allow 30 days for digging, shipping & installation. I propose that we bring Randy over to LSJ to supervise the installation with our crew and crane. So we can really get them anytime we need them, but the real reality is that we couldn't plant them until the construction is done which will 2 years be out. According to Gary, the revised Gensler plans on the main house will be done in 4 months and then we could begin demolition and construction, so that is when we should move the existing palms down to the boat dock entry area. Thoughts? STEPHEN M. CAPLINGER Vice President Design & Planning LANDMARK LAND COMPANY 4908 Brooksview Circle New Albany, Ohio 43054 EFTA_R1_0 1499927 EFTA02430091

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2430091

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.