Skip to main content
Skip to content
Case File
efta-02491298DOJ Data Set 11Other

EFTA02491298

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02491298
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: jeffrey E. <[email protected]> Sent: Saturday, August 8, 2015 6:41 PM To: Lvjet Subject: Re: GIV update we have done the fan balancing three times. te=erboro , dry lube in montreal, re rigged the spoilers. and a=l flight controls. we are now willing to replace the trunion mount c=nnisters , we are only doing this with the understanding that =olls royce will live up to its obligations under corporpate care if this d=es not fix the problem that was obvious to everyone on our test flight =/div> On Sat, Aug=8, 2015 at 2:26 PM, Lvjet wrote: Jeffrey I spoke to Gulfstream engine Tech Dave, he informs Gulfstrea= PBI was scheduled to accomplish an engine change on Monday for another cl=ent, This client just canceled his reservation. Gulfstream has the en=ine stand and Sling to remove our engines in house now. Kathleen advises that if we install Loaner engines that are located in=lndianapolis, they require a post inspection from a previous install,=this takes apporx two days to accomplish, so my best case scenario would b= Friday arrival of loaner Engines in Palm Bch or Dallas if we elected=to have Dallas Airmotive to install, plus I'm not sure if Dallas =irmotive has available manpower to take us next week. I spoke with Kathleen and Aline our Montreal Tech, appears T=unnion Mount Canister which handles fwd and aft movement should be re=laced, as I mentioned last night, this requires removing engine from =ylon in order to access Trunnion Mount. Gulfstream has Two new Trunnion Mount Canisters in Savanah price= at $12,000 each. According to my CMP Mx run, our canister were last changed in4>=A01998 at 3800 hours total time, we have 9000 hours total time on airframe= we have 5200 hours on current Mount canisters. Here is my proposal if you agree: Have Gulfstream PBI remove our engines with sling and install two new =runnion Mount Canisters and fly with our engines ONE more time. If I start=today or tomorrow, I should be able to test fly by Thursday or Friday. If we install two loaner engines plus New Trunnion Mounts at the =ame time and we have smooth flight, we will not know if we had ant>=A0engine issue or Mount issue. If we install loaner engines, it takes two days after each engine is r=moved to transfer all Gear box components (such as: air starter, Alternato=, hydraulic pump) to loaner engine, called "QEC" (Quick En=ine Change),. by just slinging our engine and installing New Trunnion moun=s, I can accomplish this in less time. Our engines are due midlife overhaul on November 2018. I have requested Gulfstream to price the removal and install labor cos= per engine, if memory serves correct, I believe labor to remove and insta=l is approx. $7,500 per engine,. I'll have firm labor cost as soon I h=ar back from my Gulfstream sales rep. Kathleen needs until Late Monday for her to consult with Rolls Ro=ce in Germany, if there is any chance of early input for overha=l. By installing new Trunnion Mount Canisters and our problem still e=ists, this could assist in early input of our engines for o=erhaul. EFTA_R1_01613246 EFTA02491298 should I proceed with Trunnion Mount Canister install only Nle=A0 thank you,. Larry =lease note The information contained in this communication is c=nfidential, may be attorney-client privileged, may constitute inside in=ormation, and is intended only for the use of the addressee. It is the =roperty of JEE Unauthorized use, disclosure or copying of this co=munication or any part thereof is strictly prohibited and may be unlawf=l. If you have received this communication in error, please notify us i=mediately by return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and destroy th=s communication and all copies thereof, including all attachments. copy=ight -all rights reserved 2 EFTA_R1_01613247 EFTA02491299

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2491298
Phone2491299

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.