Skip to main content
Skip to content
Case File
efta-02620404DOJ Data Set 11Other

EFTA02620404

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02620404
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Visoski < Sent: Wednesday, October 17, 2018 3:22 PM To: Je vacation Subject: Fwd: BB12 From Wendy in response to your email from=last week Thx Larry Sent from my iPhone =egin forwarded message: From: <mailto Date: October 17, 2018 at 11:14=14 AM EDT To: "'Larry Visoski— < <mailto:[email protected]=m» Subject: RE: BB12 <=blockquote> > > Hi Larry=br> I am not quite clear on the meaning of this=email. My response assumes the idea is for the seller to allow the buyer to=select the interior redesign he wants, with the seller assuming all a=sociated costs including the FANS 1A . The FANS 1A is not due for several y=ars, so at this point it is considered a value-added item, just as it would=be on your G-IV if it had been done. The logical time to do it us dur=ng refurb. Correct me if I'm wrong but the=only savings I see this bringing JEGE LLC are the holding costs during the r=furb which I understood would be undertaken with any aircraft. This scenario could not work for several reasons= 1. The owner has come down so low on price be=ause he wants out of the aircraft as soon as the C inspection is signed off= 2. It does not make sense for the owner to pa= for and allow a 3rd party to have control over changes to the aircra=t, including the cost for same, until title had passed. W=at if the 3rd party wanted to refit the aircraft in purple and orange or ma=e modifications halfway through the refurb that would significantly extend t=e timeline or price? Not to mention that the owner designed the curre=t interior and likes it. We now kno= the fuel mitigation mod would cost $195k and take 3 days. If w= are t to consider switching horses, we need to know what your offer would b= inspection but otherwise as is. If not, I thinks its best to just pu= the idea aside, don't you? Regards=br>Wendy EFTA_R1_01826220 EFTA02620404 Original Message <=s an> From: Larry Visoski mailto Sent: Friday, October 12, 2018 5:58 PMq=pan> To: Wendy Bierwirth < Subject: =BB12 > > <mailt° Wendy, I estimate a=prox $10M and a wait of between 9-12 months to get the BBJ2 "N*=9D registered and flying. interior, fuel mitig=tion, Paint, avionics / FANS1A etc. I assume y=u agree, I would prefer to pay you for a finished plane and we would pay th= $10M additional over todays price to your seller but he would be responsib=e for the work to bring it to certification, . thoughts? <=span> Thx Larry / Mr E. Sent from my iPhone 2 EFTA_R1_01826221 EFTA02620405

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2620404
Phone2620405

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.