Skip to main content
Skip to content
Case File
efta-02672002DOJ Data Set 11Other

EFTA02672002

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02672002
Pages
4
Persons
0
Integrity

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Eric Roth < Sent: Tuesday, Decem er , : To: 'Jeffrey Epstein' Cc: 'Larry Visoski'; 'Richard Kahn' Subject: RE: Attachments: image004jpg; image005jpg; image006jpg; image007.jpg; image008jpg; image009.jpg =AOI PRESIDENT =img width=205 height=58 ide_x0000j1030" =rc="cid:[email protected]" alt="Ill Logo - =orizontal- SMALL"> cEllia href="mailt From: =/b> =ric Roth Imailto: Sent: Tuesday, December =0, 2013 3:36 PM To: 'Jeffrey Epstein' Subject: RE: =o:p> 4=43> Air Gaspers - =o:p> Squawk: =abin area air gaspers do not seat 100% and the pressure causes a =#8220;hissing sound". EFTA_R1_01944203 EFTA02672002 Status: Larry has procured gaspers =nd plenums. We noticed that they did not come with the wire =lamps, so we will have to order them for you. We shipped one =asper overnight to Larry for delivery on 12/10 so that he may show it =0 you to identify if you want them plated or not. Est. Time Required: Metal plating =ill take approximately 10 —12 days. Once gaspers are ready =or installation, Ill will require 3 -4 days to trim escutcheons =nd install the gaspers. Upwash Lighting- Squawk: Various light fixtures are =ntermittent. Status: Each light bulb and =ssociated power supply ballast will need to be tested. IJI recommends =eplacing the light bulbs as a means of testing and perhaps more =mportantly to have even coloration throughout the cabin. Est. Time Required: IJI will =equire 1— 2 days to troubleshoot. Dependent upon finding, =t may take 1— 3 days to correct. R/H #2 VIP Master Switch =anel- Squawk: Client would like to have =he R/H #2 master switch panel reworked by manufacturer to have it =eprogrammed to control the shades "ALL UP" and "ALL =OWN". Status: The switch panel was going =o be removed at Gulfstream and sent to the manufacturer for a return on =he 20th and I found out today that this is not going to =appen. Est. Time Required: Manufacturer =as stated they will "commit" to a two (2) week turn around =o reprogram the panel and replace a few internal =arts. Window =hades- Squawk: Pleated window shade =aterial within the window panel assemblies in the main cabin are =#8220;wrinkled" at the pleats. Status: We sent an e-mail with =hoto's and waiting for vendors response including downtime =equired. 2 EFTA_R1_01944204 EFTA02672003 Est. Time Required: Waiting on =endor. Table Lid- Squawk: Client would like to route =he inboard vertical surface to provide an easier opening of lid. Status: IJI has identified Y2 =oon shape and rectangular shape. Need JE decision.. Est. Time Required: Route and =aint to coordinate — 2 days. Maintenance Runner- Squawk: Need to fabricate vinyl =aintenance runner. Status: Waiting on color choice by =E. Est. Time Required: 2 days after =eceipt of material (material should be in stock). Fwd =abin Monitor- Squawk: Fwd cabin monitor is =aulty. Status: Sent monitor to =anufacturer for warranty. Replaced with temporary monitor which =as been determined by Gulfstream Savannah to also be faulty. =nformed manufacturer that client is very unhappy with this model and =hat he would like to move away from this model and replace it with a HD =onitor. Est. Time Required: Waiting on =eply from manufacturer to see if they will accept the return and =rovide a credit towards a new HD monitor. 3 EFTA_R1_01944205 EFTA02672004 Entertainment System - Squawk: JE wants to upgrade =ystem. Status: Larry is testing the Bose =ystem to see if JE likes it. Est. Time Required: Once JE has =dentified that he would like to move in this direction, we will prepare = quote including cost and time required. =nbsp; I PRESIDENT =img border=0 width=205 height=58 id="Picture_x0020_1" =rc="cid:[email protected]" alt="Ill Logo - =orizontal-SMALL"> 0 From: =/b> =effrey Epstein [mailto:[email protected] =br>Sent: Tuesday, December 10, 2013 3:37 PM To: Eric =oth; Ivjet; Richard Kahn Subject: =o:p> you =old me i would receive a detailed scedule either late yesterday or this =orning, both have past =br> The =nformation contained in this communication is confidential, may be =ttorney-client privileged, may constitute inside information, and is =ntended only for the use of the addressee. It is the property =f Jeffrey Epstein Unauthorized use, disclosure or copying of =his communication or any part thereof is strictly prohibited and =ay be unlawful. If you have received this communication in error, =lease notify us immediately by return e-mail or by e-mail to [email protected], and destroy this =ommunication and all copies thereof, including all attachments. =opyright -all rights =eserved 4 EFTA_R1_01944206 EFTA02672005

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.