efta-02679570DOJ Data Set 11Other

EFTA02679570

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02679570
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn < > Sent: Friday, March 15, 2013 6:32 PM To: Jeffrey Epstein Cc: Rich Barnett Subject: 71st Street - Chiller/Tower Proposal Attachments: Epstein Residence.pdt Untitled attachment 00138.htm Rich B and I both followed up this week (numerous =hone calls) with Pierpont (other bidder on this job) whose original bid =ame in at 330,000. Their bid was missing Electrical and Protection =hich Rich B estimated to be approximately 20,000 - 30,000. =nbsp;Pierpont came to the house last week and was supposed to have new =roposal this week. Neither of us received a return phone call =or revised bid to reflect additional costs. This lack of =ommunication and follow through has left me very uncomfortable with =his vendor. The other bid we received was from =D Winston (dated June 19th 2012) in the amount of 357,255. Rich B =ailed ADW in Feb 2013 and asked them to update bid and lower price. =nbsp;They said that they have had price increases since June 2012 =owever in good faith they lowered bid by 5,000 to 352,255. This =eek when i spoke to ADW i asked for further price reductions. =nbsp;They reluctantly said they would lower their price to 350,000 =owever they could not go any lower. I also reviewed the scope =f their work and wanted to highlight a few =acts: a)Lead Time is 10-12 =eeks Work (start to finish) 3 Weeks If we send =eposit by Monday we would be in position to begin job in middle of June =013. b) Sales Tax will not be charged as we =ill fill out NYS Form ST-124 Certificate of Capital =mprovement c) payment terms 1/3 acceptance of =id, 1/3 upon delivery and 1/3 upon =ompletion There were two other =tems outside of this bid: 1) Rich B will need =o bring in Siemans to perform electrical control wiring which Rich B =stimates cost to be approximately $8,000 2) =nly extra not included in ADW Bid was the installation of a VFD =variable frequency drive) which varies the speed of the fans on the =ooling tower as compared to standard feature of High Low and Off. =nbsp;Currently we do not have a VFD and ADW said the payback period of =nergy savings would be approximately 10 years. The cost for this =xtra is 22,656. http:/=hpac.com/motors-drives/benefits-vfds-cooling-towers Please advise if ok to proceed with AD Winston. =nbsp; Option 1 - ADW and no VFD 350,000 - =16,666.67 deposit required Option 2 - ADW and =FD 372,656 - 124,218.67 deposit =equired EFTA_R1_01983786 EFTA02679570 Richard Kahn =It Subject: FW: Revised Chiller/Tower =roposal Hi Rich as requested here is the revised proposal =rom ADW. From: =r>To: Subject: Revised =hiller/Tower Proposal Date: Thu, 28 Feb 2013 12:25:44 =0500 Hi Richard, Attached please =ind revised proposal. Please note, that while reducing the price, A.D =inston will be receiving price increases from vendors and =ontractors. Thank =ou, Mike Michael =alladino Vice President A.D Winston Service =nc Email: Phone: Fax: &nb=p; <=div> 2 EFTA_R1_01983787 EFTA02679571

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainhpac.com
Phone2679570
Phone2679571

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.