From:
Richard Kahn <
>
Sent:
Friday, March 15, 2013 6:32 PM
To:
Jeffrey Epstein
Cc:
Rich Barnett
Subject:
71st Street - Chiller/Tower Proposal
Attachments:
Epstein Residence.pdt Untitled attachment 00138.htm
Rich B and I both followed up this week (numerous =hone calls) with Pierpont (other bidder on this job) whose original
bid =ame in at 330,000.
Their bid was missing Electrical and Protection =hich Rich B estimated to be approximately 20,000 - 30,000.
=nbsp;Pierpont came to the house last week and was supposed to have new =roposal this week.
Neither of us received a return phone call =or revised bid to reflect additional costs. This lack of =ommunication and
follow through has left me very uncomfortable with =his vendor.
The other bid we received was from =D Winston (dated June 19th 2012) in the amount of 357,255. Rich B =ailed ADW in
Feb 2013 and asked them to update bid and lower price. =nbsp;They said that they have had price increases since June
2012 =owever in good faith they lowered bid by 5,000 to 352,255. This =eek when i spoke to ADW i asked for further
price reductions. =nbsp;They reluctantly said they would lower their price to 350,000 =owever they could not go any
lower.
I also reviewed the scope =f their work and wanted to highlight a few =acts:
a)Lead Time is 10-12 =eeks
Work (start to finish) 3 Weeks
If we send =eposit by Monday we would be in position to begin job in middle of June =013.
b) Sales Tax will not be charged as we =ill fill out NYS Form ST-124 Certificate of Capital =mprovement
c) payment terms 1/3 acceptance of =id, 1/3 upon delivery and 1/3 upon =ompletion
There were two other =tems outside of this bid:
1) Rich B will need =o bring in Siemans to perform electrical control wiring which Rich B =stimates cost to be
approximately $8,000
2) =nly extra not included in ADW Bid was the installation of a VFD =variable frequency drive) which varies the speed of
the fans on the =ooling tower as compared to standard feature of High Low and Off. =nbsp;Currently we do not have a
VFD and ADW said the payback period of =nergy savings would be approximately 10 years. The cost for this =xtra is
22,656.
http:/=hpac.com/motors-drives/benefits-vfds-cooling-towers
Please advise if ok to proceed with AD Winston. =nbsp;
Option 1 - ADW and no VFD 350,000 - =16,666.67 deposit required
Option 2 - ADW and =FD 372,656 - 124,218.67 deposit =equired
EFTA_R1_01983786
EFTA02679570
Richard Kahn
=It
Subject: FW: Revised Chiller/Tower =roposal
Hi Rich as requested here is the revised proposal =rom ADW.
From:
=r>To:
Subject: Revised =hiller/Tower Proposal
Date: Thu, 28 Feb 2013 12:25:44 =0500
Hi Richard,
Attached please =ind revised proposal. Please note, that while reducing the price, A.D =inston will be receiving price
increases from vendors and =ontractors.
Thank =ou,
Mike
Michael =alladino
Vice President
A.D Winston Service =nc
Email:
Phone:
Fax:
&nb=p;
<=div>
2
EFTA_R1_01983787
EFTA02679571
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
hpac.comPhone
2679570Phone
2679571Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.