Skip to main content
Skip to content
Case File
efta-02680660DOJ Data Set 11Other

EFTA02680660

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02680660
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace Sent: Friday, August 3, 2012 9:48 PM To: Jeffre Epstein Cc: Subject: Potential sixth bay in the Engineering shed - August 3, 2012 Attachments: Old cistern jpg Greetings Mr. Epstein, Danny has a proposal fo= your review: The old cistern in the Engineering s=ed has been drained. It is approximately 20 feet by 14 feet. If a do=r opening is created in the outer wall, these could become a sixth storage=bay. Danny estimates it would be a 12 day project: 2 days to create =he door opening in the outer wall, frame and install the door (the door =s already made), 2 days to wire for electricity, and 8 days to build and i=stall shelving, epoxy the floor and paint. This project will have to be separate from the origina= 5 bays project, since that project must be completed by 8/14. Respectfully submitted, Daphne and D=nny 1 EFTA_R1_01989273 EFTA02680660

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2680660

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.