Skip to main content
Skip to content
Case File
efta-02684213DOJ Data Set 11Other

EFTA02684213

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02684213
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
ZORRO DEVELOPMENT 1/21/14 Satellite: Deposit paid to Advanced Comm — 1/17 Meeting with Advancced Comm 1/23 to confirm network map & scope of work. References/Updated Proposal from SpaceNet & Jim Cloud forwarded to Rich — 1/20 Meeting today with RMC Electric to confirm poles for links to MH & RC Pool Reulaster/SDa Clean: attached photos Plaster work finished, acid wash & filling started today Bead Blasting of Spa Tile, unsucessful, have requested estimate to replace tile & grout will forward once in hand Gate: Project Complete as of 1/21 Sony: Issues with Tablet not communicating with equipment. New Tablet has been ordered incase it is a Tablet issue IR to be extended closer to seating area. Installer back on site 1/23 to resolve issues Installation of moulding on hold until all issues are resolved Dakota Well: Rig was due on site today, delayed due to an emergency call out. Now due 1/23 Cactus Removal: attached photos Fabrication of railway tracks for drags complete. Removal of cactus continues as weather allows EFTA_R1_0200381 3 EFTA02684213

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2684213
Wire RefReferences

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.