Skip to main content
Skip to content
Case File
efta-02704504DOJ Data Set 11Other

EFTA02704504

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02704504
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn Sent: Thursday, January 21, 2016 9:01 PM To: jeffrey E. Cc: ann rodriquez Subject: Asphalt Attachments: Betteroads Proposal Asphalt Pathways Paving Little St. James Island.pdf; Untitled attachment 00136.htm; Betteroads Proposal_ Added Aggregate Base.Rev1.pdf; Untitled attachment 00139.htm; Betteroads Proposal_ LS1 Roadway.Pathway Drainage Measures.pdf, Untitled attachment 00142.htm Anna and I spoke with Jeffers and wanted to review our =indings: Original =id = 512,500 3 =9D aggregate base =/span> 90,712 Less: savings * = (9,000) Less: diesel fuel =avings •• = (3,600) Revised Total Cost = 590,612 "• Attached is Swale bid of 42,062 for 32 swales which was not =ncluded above. I do not recall if you wanted to do a smaller =umber of swales or pass for now. • =stimated savings by sourcing cheaper trucks (250 or 300 vs 400 per =effers) & using our heavy materials account for crushed stone =29.50 vs 30.00) jeffers fee (no 15% =ee on stone or portion of trucks we source) -> =ote that we may have additional costs for crusher run as Anna has -> =tated some of crusher stone has washed away and 3" does not =emain -> in all locations were it was laid =/span>-> it appears that we have already laid approximately 800 of =300 tons • • jeffers explained that he uses 1.5 gallons of diesel fuel =or each ton of asphalt paving ->1500 =ons x 1.5 gallons of diesel = 2,250 diesel gallons x 1.60 per ->gallon =avings = 3,600 ••• Note this figure does not include barge costs (we still =ave approximately 20,000 credit with boyson) Jeffers figures he needs 4-5 days to complete crusher run and =hen 3-4 weeks for Asphalt He can begin February =st and complete no later than March 4th provided work is not halted for =eather or no work days per your requests Please advise Thank =ou EFTA_R1_02091340 EFTA02704504 2 EFTA_R1_02091341 EFTA02704505

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2704504
Phone2704505

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.