From:
Richard Kahn <
Sent:
Wednesday, April 15, 2015 2:33 PM
To:
jeffrey E.
Subject:
Fwd: Quote for Big N/LSJ Barge
Attachments:
L51 BigN.pdf, Untitled attachment 00051.htm
attached is preliminary quote for barge in the amount of =50,472 please note it has not addressed items 12-18 on =ur
list
Richard Kahn
HBRK Associates Inc.
575 Lexington =venue 4th Floor
New York, NY 10022
tel
fax
cel
Begin forwarded message:
Date: =/b>April 14, 2015 at 5:02:43 PM =DT
From: =/b>gene kral
Reply-To: =/b>gene kral
To: Daphne Wallace <M1==l
Cc: Bill Hague IM=la
ann rodriquez 41111111111.1111$11S, Rich Kahn
, Island Rigging
Debra Lowry
Kral 4,:
>
Subject: =/b>Quote for Big =/L.5.1 Barge
Good Afternoon =11,
Please see attached quote.
Please send a list of all the individuals that should be =ncluded on any relevant emails to:
>, Mary
EFTA_R1_02166512
EFTA02717972
Thank you,
Gene Kral Sr.
Subbase Drydock, Inc.
Parcel 162, Subbase
St. Thomas, USVI 00802
TEL
FAX
www.subbasedrydock.com
From: Daphne Wallace
To: gene kral
Cc: =ill Hague
mailtol
>; Rich Kahn <
Sent: =onday, April 13, 2015 4:01 PM
Subject: Re: Barge =ist
>; ann rodriquez
Greetings =ene,
10 am tomorrow morning =o see Big N at the American Yacht Harbor marina is confirmed.
If Anna has any =hanges she will contact you.
Kind regards, Daphne
On Mon, Apr 13, 2015 at 2:58 PM, gene =ral <
wrote:
I would like to visit Big N =omorrow around 10:00 a.m. ok?
Gene =nbsp;
Gene Kral Sr.
Subbase =rydock, Inc.
Parcel 162, Subbase
St. Thomas, USVI 00802
TEL:
FAX
=br clear="none" class="">www.subbasedrydock.com
<http://www.subbasedrydock.comk
= From: Bill Hague =Iti
l>
2
EFTA_R1_02166513
EFTA02717973
<mailto
To: =nn rodriquez <
Cc: =ich Kahn a;
Daphne Wallace
>; Gene Kral
mailto
>
=b class="">Sent: Monday, April 13, 2015 2:29 PM
Subject: Re: Barge List
Ok.
1
=udders must be removed and the lower portion must be renewed to proper =imension. They are worn
to the point of failure and vibrate =adly.
2
We bought pumps =nd pulleys we can install but I am referencing the gear in the aft =ompartment
that is the hydraulic actuator and linkage for the =udders
3
The cylinders were =amaged at sea due to improper installation and subsequent damage from a
=roken fitting. The ramp was secured with a safety strap but still =ulled the top sealing portion out of the cylinder.
I discussed this with Roy and it was decided to =eld solid the leaking and damaged portions rendering
the cylinders =nserviceable in the future but functional for the =resent.
The fit of the mounts =eeds to be remedied at this time. The cylinders work now but are not
=epairable. Evaluation while being removed to correct and improve the =ounting is necessary at a minimum.
4
The exhaust was assembled without funding to get =he barge off the dick at the last haulout. It is not
properly assembled =r supports nor is it insulated.
6
We have new ones but need new mounting =ores
And must be done out of the water
7
8
Bearings must be purchased. I think SBDD has =hem
Inspection and new =acrificial sinks installed.
9
SBDD =hould provide this but it can be discussed.
10
Machine shop =ork
SBDD
12
This should be done at the same time the tank is =leaned.
13
=atertight compartments forward would need to be dewatered if =reached.
3
EFTA_R1_02166514
EFTA02717974
There is no ability to do so =t this time except fit the first two compartments that are joins as one =ue
to a hole in the bulkhead.
16
The gauges for oil and temp and rpm are not accurate. =ne over temperature alarm is not working as
well.
18
Parts.... As needed by =nspection.
=nbsp;
Sent =rom my iPhone
On Apr 13, 2015, at 13:38, ann rodriquez =It
wrote:
Hey Boscoe,
Please see questions ----?
I need a clear understanding of the listed items, What parts =hould we purchase and What can
be done in house. =nbsp;
1. =udders.
What should be done?
2. Steering Gear.
Did we buy the parts for this?
3. Hydraulic Cylinders.
What need to be =one?
4. Exhaust system:
What are the =ssues?
5. Engine Mounts and =lignment.
(Ok!)
6. Stuffing =oxes/seals. Install new units:
Should we buy the new units?
7. Cutlass bearings.
Do we need to =urchase?
8. Engine Cooling Grid Coolers =nd Zinks.
What need to be done?
9. =ottom Paint and Barrier Coat/ Hull Zinks.
Should we purchase?
10. Engine and marine gear control bracket =ork.
Do we need to purchase?
11. =uel tank clean out. Port and starboard.
(Ok!)
12. Starboard deck fuel fill adapter replacement. ---- Should =e replace or fix?
13. Bilge pumping =ystem forward compartments.
What about the forward =ompartments?
14. Repair existing 24 volt =lternator and add a second one to port motor.
Should we
purchase? =br clear="none" class="">15. Inspect and size all hydraulic lines =nd fittings as needed. (Ok!)
16. Engine =nd marine gear instruments in control tower.
What does this mean? =br
clear="none" class="">17. Install engine room lighting.
=Ok!)
18. Tune and service both engines =nd marine gear.
Any parts need?
19. Clean and paint engine room.
(Ok!)
Ann R.
4
EFTA_R1_02166515
EFTA02717975
DISCLAIMER: The =nformation contained in this e-mail may be privileged,confidential, and
=rotected from disclosure. If you are not the intended recipient, you =re hereby notified that any dissemination,
distribution or duplication =f this communication is strictly prohibited. If you have received this =ommunication in error,
please notify the sender immediately and delete all copies.
=font face="Arial" size="2" class=""> On Monday, April 13, 2015 =2:22 PM, Boscoe
<[email protected]> wrote:
The following is the list I discussed with Gene at Subbase =rydock today 4/13/2015.
He is =amiliar with it and is now submitted for your review.
Inspect and =epair the following;
1. Rudders.
2. Steering Gear.
3. Hydraulic Cylinders.
4. =xhaust system
5. Engine Mounts and =lignment
6. Stuffing boxes/seals.. =nstall new units
7. Cutlass bearings
8. Engine Cooling Grid Coolers and Zinks
9. Bottom Paint and Barrier Coat/ Hull =inks
10. Engine and marine gear control =racket work.
11. Fuel tank clean out. =ort and starboard
12. Starboard deck fuel =ill adapter replacement
13. Bilge pumping =ystem forward compartments
14. Repair =xisting 24 volt alternator and add a second one to port motor.
15. Inspect and size all hydraulic lines and =ittings as needed.
16. Engine and marine =ear instruments in control tower
17. =nstall engine room lighting
18. Tune and =ervice both engines and marine gear.
19. =lean and paint engine room.
Timing of work
I have been told this =aul out must be done in late April or May as there is scheduled and
=ontracted work reported for this facility during June, July and August. =br clear="none" class="">
=lease, respond with any questions you may have.
=/div>
=/div>
EFTA_R1_02166516
EFTA02717976
=Mho
=idly>
6
EFTA_R1_02166517
EFTA02717977
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01345718
0p
DOJ Data Set 10OtherUnknown
EFTA01356910
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01357392
0p
DOJ Data Set 10OtherUnknown
EFTA01935956
3p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01421331
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01369198
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.