Text extracted via OCR from the original document. May contain errors from the scanning process.
3 PR Insp
FBOP WOPM
Planned Event
NYM
10373
FM01
WO Description: Asbestos Abatement Monthly Report
Asset /I:
Asset/Group Desc:
Site Code:
Building Code:
Location:
Make:
Assigned to: FM01 • FM01
Skill: 400 - Administrative
FPS Number:
Serial NoNIn:
Model:
Date Created:
7/7/2019
If applicable, ensure all safety precautions are followed, to include, but not limited to "LOCKOUT/TAGOUT AND CONFINED SPACE ENTRY"
PM Instructions and Material:
21312 FIN
I VI m
Schedule: 33899
Pros ly
NAP Instructions
32300
Yes
Asbestos Abasement Report . Monthly
The rolowing PE is to report ALL costs, quantifies. and types of asbestos abatement to ensure proper reporting to DOJ.
Review the steps below and submit the 'Reputed Specific Documentation: ak>ng wth a copy of this PE as the cover pep. in a .Pdf fie to the
Regional Facktos Administrator by lho 1st of each month. The .pdf file must be labeled in the Needing format- Serena. Month. and Year. For
example. LEW0316. For rettorting PutheSes, each abatement event (single purchase) must be listed individually In a gdf Me.
It multiple abatement events lake places. the reporting month, produce a 'cover sheet' for each subsequent event to indicate the info motion as
required below.
Complete as requested, per each event
Is asbestos abatement In progress?
Location:
r i l 4
cr
Des ipcon:
N in
1. Abatement paid from SEE or)88F Funds" Al /4
a. If BIF Project Number _Ar/
_p/(p'
2. Was the asbestos skininedin a precious asbestis sunny? NIA
3. Is the asbestos Pleas or non-fnable"
q A
4 Quantity abated (anent reel. square feet etc):
AJIA
HS
If yes, report
asbestos
he
being abated as pan of an ESPC7 NAi
requested
requestedin
5. General description of asbestos abated (i.e_ pipe ins Iron. loot lb. etc.) N A
6 Is t
nio
lbw .pdl file roust include the following. Place a Check mart in the space ;Minded indicating the proper documentation is deluded:
7. at Order or ISSF Monthly Report.
ider
. Copy of the active cc completed minor work order or WO>$10k. Include a beef description of the asbestos abatement in the Description filet
b. Copy of the EUIF Monthly Report. Include e brief description of the asbestos abatement in the Completion Comments rod
Ensure the check box 'Asbestos Abatement is required a has been completecr on the Complete Tab is checked.
gy the asbestos abatement is procured on a Government Issued Purchase Card:
N e. Copy of completed
signed Credit Card Purchase Form. AND
b. Copy of signed and dated Purchase Card Statement from JP Meagan Chase matching purchase, AND
A c. Copy et Invoice signed by the facilities manager certifying services have been received.
9. the asbestos abatement is procured on a Purchase Order or Contract
a. Copy of completed and signed Purchase Order or Contract. AND
b. Copy of Invoice or Pay Application signed by facilities manager certifying services have been received. AND
yids_c. Copy of Payment Voucher Validation Report
mese documents can Ise obtained Iron. the Business Office and must contain appropriate signatures.
W. If the asbestos is abated during the course of on ESPC project, the ESCO (Environmental Services Contractor) shall dowdy a loner to the
Facility Manager certifying that any specific asbestos abatement as identified on an appbcazon Ice payment or itemized schedule of values has been
performed at the lime of completion of that item of work This knee shad include IM cost of the abatement. The ESCO shall repent this information for
every Instance of asbestos abatement during the course of an ESPC project. The Facility manager that send a signed copy of this letter to the
Regionsl FaCkieS Administrator indicating concurrence with the dollar amount and notification of completion of abatement
Note:
'MI abatement will be reported in the month in is 'demi. ied,atinied. if supporting documentation is not available la submission to complete the event
ding the meal reporting month then the event wit be reported on each month untill all required documentation has been finalized and submitted.
'The Asbestos Monthly Report and all required documentation to complete each event is to be maimaired on de in the Facility Managers office.
Documents may be month nod electroncaly.
if no abatement was conducted, submit a copy 01 the completed PE stating no abatement was conducted dosing the month.
Updated Aug 3t. 2017
EFTA00142422
3 PR Insp
FBOP WOPM
Planned Event
NYM
10373
FM01
Ensure all equipment has a WI label affixed that is in clear view and legible. Ensure all MWI Information is correct.
No 6.60Aterent 4 '1LS Akett, •
Act. Staff Hours:
Material Cost:
CI 2.0
0
Date Completed:
1 13I ri
Staff Sionature
Staff Code
2
EFTA00142423