Skip to main content
Skip to content
Case File
efta-efta00299435DOJ Data Set 9Other

Stepping Stones M & G LLC

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00299435
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Stepping Stones M & G LLC 3 Morse Court New Canaan, CT 06840 Name / Address Groff. Lesley Estimate Date Estimate # 81232013 2846 Project Masterbath Fabricati... Description Qty Rate Amount Unit sq.ft.o pcs Total Masterbath Fabrication Material and fabrication of 3cm White 2 1,33435 2,669.50 2,669.50T Cararra Honed Vanity. Based on 11.15 Sq.Ft. of material with undermount sink cut out and 7.75 linear ft. of Eased edging and 7.75 linear feet of 4" backsplashes. Trade Discount -10.00% -266.95 -266.95 Labor to template and install Vanity. 1 280.00 280.00 280.00 Material & Fabrication of 2cm White 1 1,435.55 1,435.55 1,435.55T Cararra Marble Shower Jambs. Based on 26.1 linear feet of material (Does not include ceiling). Trade Discount -10.00% -143.56 -143.56 Material & Fabrication of 2cm White 1 175.00 175.00 175.00T Cararra Corner Shower Seat. Based on 18"x18" with front edge eased. Trade Discount -10.00% -17.50 -17.50 Subtotal S4,132.04 Sales Tax (6.35%) $244.60 Total $4,376.64 EFTA00299435

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.