Skip to main content
Skip to content
Case File
efta-efta00496302DOJ Data Set 9Other

From: Lesley Groff <1

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00496302
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lesley Groff <1 To: ' Subject: Re: Schedule Date: Wed, 29 May 2019 19:34:21 +0000 Ok thank you John!! Sent from my iPhone On May 29, 2019, at 3:31 PM, <1 Hi Lesley, >< wrote: Please find a tentative schedule for the projects as requested. The impending rains has changed my schedule drastically. I have to run now to take my daughter to the ophthalmologist and running late. if you find any time line error that is the reason why. I need to go through the schedule again but this is a start. Regards John Original Message Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ) From: Lesley Groff < > Date: Tue, May 28, 2019 3:53 am To: John Bedminster < Cc: Mike Glidden < >, Rich Kahn HI John...thank you so much for these quotes..Jeffrey is asking for the timing of the projects please... when could you start and when is projected completion date. thanks! Lesley On May 25, 2019, at 11:00 PM, < Hello Lesley, > < > wrote: Please find attached the proposal for the Shade Structure and the installation of doors at the engineering building. Have a wonderful weekend. Regards John Original Message Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ) From: Lesley Groff < > Date: Wed, May 22, 2019 6:56 m To: John Bedminster < Cc: Mike Glidden < >, Daphne Wallace Ann Rodriquez Rich Kahn < EFTA00496302 Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the Shade Structure and Engineering Doors... Lesley On May 22, 2019, at 8:41 PM, < HI Ms. Groff, >< > wrote: Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to determine all possible aspect of the shade structure located at the flag pole and pool area. I should be able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I will be on St. John in the morning and may not have phone service. If any thing please send a text. Best Wishes John Original Message Subject: Shade /En ineering Doors Bid (LSJ/GSJ) From: Lesley Groff < Date: Tue, May 21, 2019 2:46 pm To: Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to me as soon as possible with this bid? Also wondering about the bid for the engineer doors? Please let me know! Thank you, Lesley LSJ/GSJ Sent from my iPhone cLSJ-Engineering bldg.pdf><LSJ-Shade structure.pdf> <LSJ-Pool Shade Structure & Engineering-construction schedule -May 29 2019.pdf> EFTA00496303

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.