Skip to main content
Skip to content
Case File
efta-efta00498308DOJ Data Set 9Other

From: Lesley Groff

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00498308
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Lesley Groff To: Jefffrey Epstein <[email protected]> Subject: Paul Gandy UPDATE-Fwd: Cable Routes Date: Thu, 13 Jun 2019 13:11:29 +0000 I followed up with Paul re his visit and requested an update. Please see below from Paul: Begin forwarded message: From: Paul Gandy Subject: Re: Cable Routes Date: June 13, 2019 at 7:40:44 AM EDT To: Lesley Groff < Cc: Daphne Wallace Glidden < , Anna Rodriquez <a., Mike Thank you Leslie, yes the trip was very successful and clarified the project for us. We were able to meet with Michael and tour both islands and the facilities that were recently added. We also discussed the project goals for Michael which allowed us to narrow our scope of services from our earlier discussions about various cable routes, etc. Additionally, we have examined 18 months of previous electrical usage to assist us in confirming loads and capacity for the LSJ consumption. Michael also provided with information regarding the seawater RO plant and distribution pumping system for purposes of developing and scope for providing a water line over to GSJ. We are currently preparing two separate scopes/proposals. One for engineering of an electrical power loop around GSJ, to be installed by Owner's contract forces and one for project management and/or turnkey installation of the short run of submarine cable and water line from LSJ to GSJ including landslide power equipment and facilities on each side. We are currently conducting some preliminary engineering activities in order to develop the scope and cost for each proposal and time frame for the work. We expect to have a proposal for the first scope of services (GSJ Electrical Loop engineering)to Michael for review on Monday, June 17th. The second proposal should come a few days after that as we are awaiting equipment delivery times and input from installation forces to complete the scope. We also continue to speak with Michael as questions come up and we are speaking with Bioimpact as well to coordinate on the subaqueous permitting side of the crossing. Thank you for assisting in setting up the visit and having us over. Best regards, Paul Gandy, PE Globaltech, Inc. On Jun 11, 2019, at 2:14 PM, Lesley Groff > wrote: EFTA00498308 HI Paul...hope your trip was successful...wanted to follow up and see if you had your thoughts on the project to provide to Mike? Lesley On May 30, 2019, at 5:10 PM, Paul Gandy > wrote: EFTA00498309

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.