Skip to main content
Skip to content
Case File
efta-efta00521485DOJ Data Set 9Other

Prime Renovations & Painting

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00521485
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Prime Renovations & Painting 11 Cora Court Hampton Bays New York 11946 U.S.A (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York 10021 New York Estimate Estimate Date : # EST-1176 10/25/18 Item & Description Jt 1 SCOPE OF WORK: Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing Prier demolition 1. shut down water to the steam shower, toilet room and sink remove all plumbing fixture 2. remove toilet water line as well as waste line 3. relocate water lines including steam head outlet relocate controllers 1.00 5,000.00 5,000.00 1.00 9,500.00 9,500.00 3 Demolition: 1.00 11,500.00 11,500.00 1. Remove 3 brass doors leading into the steam room, shower & toilet MOM Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches 3. completely remove wall between toilet room and steam shower to expand steam room Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo sink wall by removing all stone and drywall boards and framing Cart away all debris 4 1.00 37,000.00 37,000.00 EFTA00521485 Finish Work 1. frame new bench in stem shower 2. install 5/8 cement boards to the ceilings, walls and bench 3. completely waterproof steam shower ceilings, walls and floor 4. install new tile to the ceiling, walls, bench and floor 5. grout tiles 5 Electrical supply and install new exhaust fan exhaust steam into shower install switch for exhaust fan to turn on when exiting the steam room install new lighting in steam room 6 GLASS supply and install new glass panels with shower door to the new steam shower instal new glass door to walk•in shower 1.00 3,800.00 3,800.00 1.00 8,500.00 8,500.00 7 PAINT 1.00 6,500.00 6,500.00 completely paint ceiling and walls that are not getting tiles 8 Cleaning 1.00 2,000.00 2,000.00 thoroughly clean all the work areas and remove all tools and any other debris left Sub Total 83,800.00 Total $83,800.00 Notes All tiles and any other fixtures are to be provided by client Terms & Conditions Looking forward to your business Estimate valid for 30 days 5096 deposit required to begin work Contractor: Prime Renovations & Painting (signature) Date: Client: Mervin Dela Cruz (signature) Date: EFTA00521486

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone(631)680-2238
Phone(917)287-2878

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.