Punch List —April 9th 2012
1. Rug Pads — for JE bath & 3 guest rooms on site 4/10
2. Flagpole Pool Cabana —
- Concrete Roads —road transition needs to be reconfigured/flatten out
- Landscaping - remove Bougainvillea & Hydroseed area
- order GeoMat for track from Beach to Flagpole
- Landscape Lighting —require switches/controls for Palm Tree lights
- Fabric - on site, orange piping & pillow for sofa/chairs
via JE's direction to be completed in May
rug on site 4/10
review possibly another piece of furniture - Sarah
3. Five Palms - interior wall requires finishing
- Electrical — genset location determined, need to review Generator
- Floor- material selected, investigating availability
- Door Fabrication — manufacturer on site 4/, expect proposal 4/13
- Lighting Schedule — complete
- Coral Stone Bull Nosing - modeled after MC, ongoing
- Fire Pit —on hold
- Ramp & Road Transition — work continues
- Placement of Parrots— expected completion 4/13
- Moloyanux Painting — to glued to ceiling, cut out light areas, boarded with cornice molding (approx 6 to 8
inches wide) & painted white
- Furniture — review
X 2 cannonball lamps, bronze lamp
- more dirt required
4. Grotto -
- Concrete Steps - ongoing
- Slab & Columns — expected completion 4/13
5. Heli Road — ongoiong
6. Hangar— fill in expansion joints
kitchen wall — installed by 4/13
- Concrete Floor - grinding ongoing
- Painting —interior painting requires
hanger door to be painted white
painting floor
- Purchase Sm Utility Vehicle, for towing Heli
7. Steel Shed - have estimate, Brice to investigate faster ordering approach
8. Triangle
9. Entry Tree Lights — lights on site
10. Solutions for Generators —Brice to investigate other options
construction of wall to start 4/10
11. Top of hill — CLEAN UP — remove rocks & hydroseed
12. Palms - on site, being placed via JE's direction
13. Tiki - Shields — ETA mid May
14. Sunken Garden Berm - continues
15: Main Compound — order GeoMat for track from MC down big hill
16. Bench Placements/Construction — Placement via JE direction. Tom to make 5 benches
17. Engineering —
- Clean Up - continues
- Service Road Reshaping —continues
EFTA00522039
- Landscaping — planting Seagrape
18. New vehicles — two more Polaris bikes (800's) — Larry/Brice
19. Dock-
- Decking - discuss pressure treated timber/carpeting
- Extension - design required
- Floating Dock — design required
- Jetski Docking -
- Table — order? Require direction
20. Mgrs Cottage Roof — continues
21. Mooring Permit — proceeding with bids to place anchors
22. Electrical Quotes — on site, generator to be determined
23. Telephone system — remove/add speed dial — will be completed after visit
24. Gates - to hide engineering both at top and bottom of hill — require location
- Columns — engineered by Tom
- Construction — Brian & John
25. Guest House at Beach 3 — sited, needs to roughed out
26. Kite House — review of wooden outside furnitue
27. Chillax Room — requires furniture piece for electrical/media equipment — Sarah
28. Chilax Bathroom - requires blue rugs for bathroom & vanity area - Sarah
29. Mechanical Building
- Replacement Transformer — approved to purchase
30. Boats
- Midnight Express — 4/2 approved to purchase Yamaha 300 motors
- ship existing motors to FL, LV to sell
- PRD — sell
- Lady G — sell
- Big N - sell
- Calypso — refurbish
31. Sundial — grooves to be cut
32. Hydro seeding — as much as possible especially when it rains
EFTA00522040
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
refurbishForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.