Skip to main content
Skip to content
Case File
efta-efta00522423DOJ Data Set 9Other

JE Punch List —January 3, 2013

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00522423
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —January 3, 2013 1. Equipment and Vehicles - No equipment or vehicles etc off the island unless approved - Brakes Black Bikes — reviewed & adjusted 1/3 - Excess Oil Disposal — proposal forward to Rich K 12/4, refowarded to Jeanne 12/29 awaiting direction - Electric Golf Cart Damage —forwarded photos to dealer 1/1 awaiting response -2. Five Palms - Picture Frame (86 x 70) & Canvas on site — forwarded to framer 1/3 completion expected 1/22 3. Dock Boxes - Fabricated a lighter lid, still to heavy— investigating resin/plastic option, up to 4 ft high will forward 1/5 4. Boats - Lady G — sell — will remain at Nanny Cay until sold. - Midnight Express — buyer on site 12/21 will make contact by 1/15 - Purchase Yacht Tender— options forwarded to JE awaiting direction - Purchase New Boat to replace Midnight — require budget - Repower Little C —Jeanne investigating 5. Landscaping — Peters List - Line all Roads with Rocks — ongoing - Loading Dock — requires redesign - Black Heli Under Pads — installation to begin 1/10 existing pads to be removed - Sea Grape/Citrus Fertilizer/Mulch/Plant Material — ordered — nursery reopens 1/7 awaiting ETA - Sunflower seeds — ordered — John Deere reopens 1/7 awaiting ETA - Removed Palm Tree on MC Hill — replacement? 6. Roads - General re-grading of roads — ongoing 7. Library - Chiller — estimate forwarded 12/24 to JE for review. 12 week lead time for equipment. 2 to 3 weeks installation Jeanne investigating another company, awaiting update 8. Hangar - Fuel Containment Pad — Plan ready for submission, waiting for finalization of VIPA Lease. Plans sent out for new bid 9 Steel Shed — On site. Container emptied on LSJ & stored until installation crew on site. Construction crew ETA 1/18 - Lights, Switches, Electrical Equipment order — Danny to finalize 1/5 - Refit Existing Shed — sheeting etc ETA 1/5 roll up door to sail 1/9 10. Equipment/Household Purchase and Delivery - Italian Deck Chairs — shipped from Italy 12/20 ETA STT 1/23 - Pool Towels — on site —JE not happy with "feel" prefers previous towels. Sarah investigating other options - Pace Clocks x 2 units — shipped to incorrect address — reordered — again delivered 12/28 to incorrect address. Daphne trying to track down awaiting ETA - Ride On Mower — with bag option. JE approved. Rick K to finalize - Fuel Truck — repair work estimate $15K. Review purchasing new unit. - Tool Boxes —will forward options ASAP - Pool Ladders —ETA 1/11 - Outside Lanterns — unable to get replacements, investigating other options - Media Center — Relax Room — Copenhagen unit selected, will forward options - Desk - Flagpole Pool Cabana — still in Paris awaiting ETA - Rug — Flagpole Pool Cabana — ordered ETA mid Feb - Portable Electric Oven — shipped to FL 12/26 ETA FL 1/8 11. Containers — RO & Generators in remaining container — possible offer due 1/5 EFTA00522423 12. Stone Walls — Repair work to replace missing loose stones & complete Heli Pad wall — after Employee Bathroom Project 13. Cisterns - - Bid approved 11/8 Material on site. Start to empty cisterns 1/3. Work to start 1/11 Expected completion by 2/13 - All furniture in rooms 1 & 2 needs to be removed or covered before work begins - After repair complete - Laundry, Hobbits, Bathroom, Pump Rm, Tech Rm all require repair/plaster/paint 14. Solar — - Solar Vendors — Toshiba reps on site 1/7. Toshiba have postponed on site visit. Awaiting final proposal 15. Media - - Larry investigating purchase Stewart Screen, Blue Ray DVD Player (Screen Rm), Sub, Mini System (kitchen) 16. Cell Repeater & Broadband — -Jeanne investigating options 17. Pools- - Installation of x 2 variable speed pumps per pool - Flag Pole Pool — steps to be installed — require JE direction - MC Pool — steps to be installed to pool pump room 18. Roads- - Other solutions to be investigated 19. Moorings- - Request inspection from USCG — Darren 20. Storage Areas - - All areas to be organized & inventoried 21. AC — - Proposing that the 20° unit from Kitchen is replaced & relocated to a Hobbits 22. Fire System - - Pipe that feeds the 300,000 gal system needs to be replaced. Draining of tank started 1:3 Will forward complete costing once pipe is inspected & scope of work determined EFTA00522424 David - - Employee Bathrooms — material on site, demo started 12'28 rough in plumbing complete, concrete work to begin 1:4 - Pergola Construction — High Road Benches — require design details/numbers from JE - Planter Boxes — completion 1/10 - Bronze Sculpture — to be raised - Barge — Chocks - Pops Garden — Demo existing, construct new shade/planter area - Tiki House — Propane Stand - Beach Equipment/Toy Rack - Captains Office — AC Frame - Lattice Panels Installed — tunnel - Nap House/Staff Cottage — Replacement of all Screens - Redesign & install all new beach signs - Cleaning, Organizing & Inventory of Wood Shop Danny & Jermaine - - Beach Office — no Internet/phone since - 12' 14 - repair outside light - Relax Bathroom - rewiring - Pool Cabana - change lights parking area - Screen Room - repair lamp - 5 Palms — repair x 2 floor lamps - review exposed wires around coconut palms - Berm — cover electrical box - Info Center — review outside electrical box area - Kite House & Pebble Beach - review solar, relocate solar panel to roof of Pebble Beach House - Tiki House — instant hot water system to be installed 119 - reinstall light cover in kitchen - Captains Office — installation new AC (on site) - Under Master Bedroom — repair AC unit - Phones Down — master bathroom, room 4, 5 Palms, - Lightbulb Replacement — Sarah's Office, Library Blackboard & Ceiling, Master Closet Area, - Beach Lighting — section out - Water Proof Covers — for all outside electrical areas — hanger, flag pole pool Carlos - - Hangers for Life Jackets — purchase 8 - Cleaning, Organizing & Inventory of Marine Shop, Dock Boxes Maintenance - - Barge — Paint Window Frames - Bronze Sculpture — base painted same as wall color - Gym/Bathroom/Roof — repainted - Hanger Area — door resurface & stain - paint concrete block supporting wind sock - Tiki Kitchen Roof - replacement - Flag Pole Pool - resurface & finish outside table & benches - fridge need to be bolted down - MC — replaster/paint rising lawn edging - restain upper ceiling St John & Courtyard Office — repaint air vent - Wooden Planters (new & old) - seal - Captains Office — plaster/paint interior - Thatch — all locations require new sections - Fans - Rust - Info Center — review drainage in parking area EFTA00522425 New Employees — Full Time Housekeeper IT Support Landscape Supervisor — 2 to 3 times a week Big N — Barge Captain & Maintenance contract option Marine — Maintenance contract option EFTA00522426

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefowarded

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.