Skip to main content
Skip to content
Case File
efta-efta00543783DOJ Data Set 9Other

From: Daphne Wallace

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00543783
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace To: Jeffrey Epstein , TOM MELNICK Rich Kahn Cc: Craig Martin Subject: Photographs - May 25, 2012 Date: Fri, 25 May 2012 19:25:24 +0000 Attachments: l_Five_Palms_door_handle_(1).JPG; l_Five_Palms_door handle_(2).JPG; 1_Five_Palms_door_handle_(3).JPG; l_Five_Palms_door handle_(4).JPG; 1_Five_Palms_door_handle_(5).JPG; l_Five_Palms_door handle_(6).JPG; 1_Five_Palms_door_handle_(7).JPG; l_Five_Palms_door handle_(8).JPG; 1_Five_Palms_door_handle_(9).JPG; 1 Five Palms floor_(1).JPG; l_Five_Palms_floor (2).JPG; l_Five_fralmt—floor_C3).JPG; l_Five_Palms_floor (4).JPG; l_Five_Palms_floor (5).JPG; 1_Five_Palms_floor_(6).JPG; l_Five_Palms_floor (7).JPG; 1 Five Palms floor (8) JPG. 1 Five Palms floor (9).JPG; 1 Five Palms floor (10).JPG; l_Five_Palms_floor (11).JPG; 1 Five_Palms_hydroseeding_(1).JPo; _ _ 1_Five_Palms_hydroseeding_(2)7JPG; l_Five_Palms_hydroseeding_(3).JPG; 1_Five_Palms_hydroseeding_(4).JPG; l_Five_Palms_hydroseeding_(5).JPG; 1_Five_Palms_hydroseeding_(6).JPG; l_Five_Palms_hydroseeding_(7).JPG; 1_Five_Palms_hydroseeding_(8).JPG; 1 Five_Palms_hydroseeding_(9).JPG; 1_Five_Palms_hydroseeding_(10).JPG; T Five_Palms_hydroseedint(11).JPG; 1 Five Palms wall coating_(1).JPG; Ifive_Palms_wall_coating_(2).JPG; 1_Five Palms wall coating_(3).JPG; 1 Five Palms wall coating_(4).JPG; 2_Groto_(1),IPG; 2_Grotto_(2).JPG; 2:GrotTo_(3).JiG; 2_Grotto_(4).JPG; 2Grotto_(5).JPG; 2 Grotto_(6).JPG; 2 Grotto_(7).JPG; 2_Grotto_(8).JPG; 3_Berm_(1).JPG; 3 berm_(2).JPG; 3_Berm_(3).JPG; 3_Berm_(4).JPG; 3_Berm_(5).JPG; 3_Berm_(6).JPG; 3 Berm_(7).JPG; 3 Berm_(8).JPG; 3 Berm_(9).JPG; 3 Berm_00).JPG; 3_Berm_(11).JPG; I Berm_02).JPG;- 3_Berm_(13).JPd; 3_Berm_04).JP—G; 3_Berm_(15).JPG; 3_Berm_(1 6).JPG; 3_Berm_(17).JPG; 3_Berm_(18).JPG; 3_Berm_(19).JPG; 3_Berm_(20).JPG; 3_Berm_(21).JPG; 3_Berm_(22).JPG; 3_Berm_(23).JPG; 3 Berm_(24).JPG; 3 Berm_(25).JPG; 4_Engineering_(1).JPG; 4_Engineering_(2).JPG; 4_Engineering (3).JPG; 4_Engineering_(4).JPG; 4_Engineering_(5).JPG; 4_Engineering_(6).JPG; 4_Engineering_(7).JPG; 4_Engineering_(8).JPG; 4 Engineering_(9).JPG; 4 Engineering_(10).JPG; 4_Engineering_(11).JPG; —Engineerint(12).JPGT4 Engineerint(13).JPG; 4_Engineering_04).JPG; 4fingineering_05).JPG; 4—fi ngineering_(16).JPG; 4 Engineering_07).JPG; 4_Engineering_08).JPG; 15_Dock ramp_to_floating_dock_(1).JPG; 10 Dock ramp_to_floating_dock_(2).JPG; I0_Doccramp_to_floating_dock_(3).JPG; 10—Dock—ramp_to_floating_dock_(4).JPG; I0_Doccramp_to_floating_dock with_GREf deckIng.JPG; 10 DocCramp_to_floating_dock—with TAUPg decking.JPG; 10 Dock_trim_stained.JPG; 15—Nanna_tubespainted_(1).JPC, 15 Ranna_tutes_painted_(2).FPG; 15—Nanna_tubespainted_(3).JPG; 15—Nanna_tubes_painted_(4).JPG; 15—_Nanna_tubespainted_(5).JPG; 15—Nanna tubes_painted_(6).JPG; 16_Gym_road_grading_(1).JPG; 16_5ym_ro;d_grading_(2).JPG; 16_Gym_road_grading_(3).JPG; 16_Gym_road_grading_(4).JPG; 16_Gym_road_grading_(5).JPG; 16_Gym_road_grading_(6).JPG; 16_Gym_road_grading_(7).JPG; 16_Gym_road_grading_(8).JPG; 16_Gym_road_grading_(9).JPG; 16 Gym_road_grading_(10).JPG; 16_Gym_road_gradint(11).JPG; lg Gym_road_grading_(12).JPG; 16_Gym_road_grading_(13).JPG; 16—_Gym_road_grading_(14).JPG; 16_Gym_road_grading_(15).JPG; 16_Gym_road_grading_(16).JPG; EFTA00543783 21_Pergola_construction.JPG; Beach_hydroseeding_(1).JPG; Beach_hydroseeding_(2).JPG; Grading_at_lower_gatet(1).JPG; Grading_at_lower_gates_(2).JPG; Grading_at_lower_gates_(3).JPG; Grading_at_lower_gates_(4).JPG; Grading_at_lower_gates_(5).JPG; Grading_at_lower_gates_(6).JPG Greetings Mr. Epstein, May 25 photographs for your review and comments: 1 Five Palms - floor, door handle, hydroseeding 2 Grotto 3 Berm 4 Engineering 10 Dock ramp to floating dock Question for JE: Do you prefer the Grey decking, or the Taupe decking? 10 Dock trim stained 15 Nanna tubes repaired and painted 16 Gym road grading 21 Pergola construction Beach hydroseeded Grading at lower gates Respectfully submitted, Daphne EFTA00543784

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.