Skip to main content
Skip to content
Case File
efta-efta00595008DOJ Data Set 9Other

01/20/2809 15:58

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00595008
Pages
5
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
01/20/2809 15:58 9089966958 SAWYERS CONTROL SYS PAGE 02 Sanyers Control Stirents inc. BILL TO Jeffrey Epstein NES, LLC 9 East 71st Street New York, NY 10021 133 Couuy Road SU FicrKb:Orni. 34/ ONUS plume 906 996 6903 fax 906 996 6958 m.yennmOolheom SHIP TO Jeffrey Epstein NES. LLC 9 East 7Ist Street New York, NY 10021 Ann: Richard Invoice DATE INVOICE 1/7,2009 20090028 NO. TERMS Net 30 QUANTITY DESCRIPTION RATE AMOUNT This invoice Is far a Deposit for the 'CCTV System Upgrade" as proposed by Sawyers on Newanber 25. 2008. We asking for a 30% deposit to begin ordering the equipment. We apect the moral to take about then weeks from now until completion. 0 3 30% Deposit for Equipment ordering for the CCTV 53 secnt Upgrade. New York Saks Tax Thank you for your business! Vi-A4)2yOz-' *9 et 42,730.00 t2,8to.o0 8.375% 1.073.59 Total 813,892.59 EFTA00595008 FW: Demostic Hot Water Repair 71st Street low zone, C-levc1,1st lt2nd Hoorstsecunty ' ige r ur From: To: Subject: FW: Domestic Hot Water Repair 71st Street low zone. C4evel.1st 82nd Floors(secunty Upgrade.) Date: Mon. 29 Dec 2008 12:40 pm Emad Hanna Project Controller HBRK Associates, Inc PO Box 400 New York, NY 10150 ft (212) 327-0106 Fax (212) 327.0434 ehanna©hbrkassociates.com From: Jeffrey Epstein Sent: Monday, December 29, 200W To: Richard Barnett; Darren Indyke (AOL); Emad Hanna Subject: Re: Demostic Hot Water Repair 71st Street law zone, C-level,lst 82nd Floors(security Upgrade.) approved On Mon, Dec 29, 2008 at 11:46 AM, Richard Barnett <[email protected]> wrote: Hi Mr. Epstein the Cost of the security upgrade is S43.000.00 the installation will start proposal approval date,due to equipment & material delivery time .The actual equipment installation will take one week to install after all the equipment is received. Thanks Richard. Date: Sun. 28 Dec 2008 18:49:33 -0500 Sul*. • Water Repair 71st Street low zone, C-levellst &2nd Floors From: To: Please give me a schedule and cost for secuirty update On 12/27/08 4:07 PM, "Richard Barnett" > wrote: Hi I completed the steam hot water heater repair for the patterson kelly hot water heater at 71st street on Saturday 12/27/08 with an engineers helper attached Is pictures of the repair, system Is back to normal Happy New Year. Richard Barnett. Life on your PC is safer, easier, and more enjoyable with Windows Vista®. See how <http://cl 1?7032870/d.(rect/01/> Life on your PC is safer, easier, and more enjoyable with Windows Vista®. Sec-how 12/29/2008 EFTA00595009 November 25, 2008 Mr. Richard Barnett 9 East 71" Street Dear Richard: Sawyers is pleased to present to you and Mr. Epstein the following quote to for the provision. fabrication and installation of a complete CCTV system upgrade for the residence at 9 East 71" Street. The main focus of this proposal is the replacement and upgrade of the CCTV Monitor Command Center. We plan to install a modular Winstead Rack that will be configured for (I I) Monitor ports. Eight of these will be utilized for the cameras, and the existing "Quad" processors will be re-used to feed these monitors. Two bays will be used to house the computer monitors while the lost bay will be used for housekeeping items for shelving and organizing the Command Center. The Winstead rack we are proposing will have work surface shelves, storage drawers and a clean wrapped surface. This type of rack is more institutional looking and we would recommend that a carpenter "wrap" the console with more appropriate finishes. Typically the top surface would be finished with a stone or laminated counter while the sides would tend to be skinned with finishes to match the room'sdecor. The actual footprint of the Winstead Console is also different than the existing structure. so we would recommend replacing the carpeting as well as part of this process. In addition to upgrading the Command Center's physical structure we will also be installing new LCD flat screen monitors for viewing the cameras. Sawyers has included pricing in our proposal for upgrading numerous IR illuminated bullet cameras located throughout the residence. We plan to change (4) Interior Bullet Cameras, (4) Exterior Bullet Cameras and (2) Foyer Cameras. The existing PanffiltrZoom exterior camera has been "fogging" from water seepage around the seals and we are recommending replacing that unit as well. All of the new cameras will rout to a new Intellex Digital Video Recorder with a 500 gig storage drive that will maintain a record of the images for about 3 weeks. This project will disrupt the existing Command Center for approximately 1 week. Sawyers willhave a crew on-site to dismantle and remove the existing structure and then to re-build the new system. We plan to complete the Command Center conversion, then switch to changing out the field cameras within the residence. When we arc complete, you will have a completely upgraded camera system with new viewing monitors, recorders, and field cameras. Please feel free to call if you have any questions, or would like to proceed with the project. Sincerely, Tom Callahan President. Sawyers EFTA00595010 9 East 71" Street —CCTV Upgrade Proposal (1) (8) (8) Complete Winstead Console — 7 Bay Design, 4 High and 3 Low Includes all framing, sides, shelves, caps as well as shipping costs. * Matches approved CAD drawings from 10.15-08. Ganz ZML 17A — IT' LCD Dual Input Monitors @r 580 Ganz ERK- I 7 Rack Mount Adaptor Kit (2) 50 S 12.100 S 4,640 $ 400 (4) Speco HT-Int-B8 Interior IR Illuminated Bullet Cameras ® 400 S 1,600 (4) Everfocus EZ550 Exterior IR Illuminated Bullet Cameras ® 565 S 2,260 (2) Foyer Bullet Cameras — (Replacing Pin Hole Cameras) ® 565 S 1.130 (Exact model selected to best match existing finishes) (1) Sensormatic Intellex Digital Camera Recorder — ADD600DVD050 $ 6.825 (16 Cameras, 500 gig Hard Drive, Deluxe version, 4.2 software.) (1) Sensormatic — RAS917OPC Exterior Day/Night PIT/Z Color Camera Kit S 2,375 (I ) Bullet Camera and PTZ Camera replacement Labor $ 2,800 ( I ) \\Instead Command Center Demolition & Fabrication S 8,700 Complete Turn-Key CCTV System Total S 42,730 EFTA00595011 01/20/2009 15:58 9089966958 SAWYERS CONTROL. SYS PAGE 01 SAWYERS CONTROL SYSTEMS. INC. 133 COUNTY ROAD 513 FRENCHTOWN, NJ 08825 FACSIMILE TRANSMITTAL SHEET To. Enud rttoa Pat Callihan COMPANY: DATE 1/20/2009 TOTAL NO. Or PAG►S olCLUOLNG COVER 2 PAX NUMBED 646-350-0221 PI1014C HUMOUR: MINIM'S VAX it 908-9964958 Ra SENDER'S NIONB Epstein Invoice 908-9964903 K URGENT K FOR REVIEW K PLEA= commRsav K PLEASE REPLY K PLEASE RECYCLE NOCIAICOioitroX I am forwarding the Invoice for the "deposit" for the CCIV System Upgrade 155 COUNTY ROAD 515 VUENCIITOWN. NJ 01425 EFTA00595012

Technical Artifacts (13)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainhbrkassociates.com
FaxFax (212) 327.0434
Faxfax 906 996 6958
Phone(212) 327-0106
Phone(212) 327.0434
Phone646-350-0221
Phone7032870
Phone906 996 6903
Phone906 996 6958
Phone908-9964903
Phone908-9964958
Phone9089966958

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.