Skip to main content
Skip to content
Case File
efta-efta00595247DOJ Data Set 9Other

Refurbishment Ranch Central

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00595247
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Refurbishment Ranch Central Self Perform Picket Fences 9,200.00 Mulch S 5,100.00 Tiller Rental S 2,500.00 Seed 2,500.00 Irrigation 5,563.00 Paint 1,000.00 Total Cost $ 25 863.00 etS/O fLqizt7- /// EFTA00595247 Estate Report Page I of I al Home Documents and Lists Create Site Settings Help Select a View All Events Calendar Current Events JE Report Active Projects Actions 0 Alert me a Export to spreadsheet o Modify settings and columns Zorro Ranch Estate Report Up to Epstein Interests Intranet PI ]New Item I 'tirilter I .Edit In Datasheet abLink to Outlook Status Prot No. Pro) Name Info/Status Info/Status Info/Status Info/Status Info/Status I nfo/Status 41 Permitted/Leased Land - Business Lease SS New Estancia Fountain 99 Refurbishment Landscape Lights • MH 103 Resealing Wood - Stables & Adobe 105 Exterior Stucco Repairs at MH 111 Replacement Picket Fences/Refurbishment RC Info/Status 112 Mech Workshops/Wash Pad Construction Information Responsibility Photo/Attch .JE Directive JE Comment 4/27 • Awaiting date for an on Brice/Karen No site assessment for fees etc by NM State 4/15 - Installation contractor on Brice/Karen No site, received all relevent details. weight, access, location etc. Expect estimate 4/29 4/27 - Project 90% complete. Brice/Karen No Completion expected 5/1 4/20 • Due to cold weather, start Brice/Karen No date expected mid May 4/15 - Contractor on site to review scope of work. Expect es ma Brice/Karen No 4/20 - lEE approved replacement Brice/Karen N of all picket fences & refurbishment of grassed yards at RC Attached material budget, all labor "in house" 4/20 • ME approved relocating Brice/Karen No Mech Workshops to Pole Barn area & construction of concrete wash pad outside Workshops Attached material budget, all labor "In house" http://websrvOl/zorro/Lists/Estate%20Report/JE%20Reportacpx1ShowInGrid=ifTW. 4/27/2009 EFTA00595248

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

URLhttp://websrvOl/zorro/Lists/Estate%20Report/JE%20Reportacpx1ShowInGrid=ifTW
Wire RefRefurbishment
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.