Skip to main content
Skip to content
Case File
efta-efta00606053DOJ Data Set 9Other

ENGINEERING DEPARTMENT CHECK LIST

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00606053
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
ENGINEERING DEPARTMENT CHECK LIST Checklist for items that needs to be in complete working order before HE arrival. Items should be kept in constany working order, with a final and thorough check a minimum of 24 hours before arrival. MAIN COMPOUND WEEKLY TASKS Pool Lights Pool Pump Pool Heater Outside Sconses (USE LED ONLY) Tree and Art/statue lights All lights timer settings Check exposed wires Flood lights Ceiling lights Thermostats (Write temp setting) Run faucets, Flush toilets, check for leaks Check cisterns Check Septic tanks for smell Check door and window hardware Approved Lightbulbs Pool Librar Master Bed Chillax Cabanas Kitchen Theater Roads Sconses: Ecosmart A19 Soft White LED, 450 Lumens 12 V tree lights: Philips MR16 20W Halogen, 240 Lumens. To be phased out with LED Replacement LED is: GE Soft White 4W, 210 Lumens, 2900 Kelvin 12 MR16 Pool lights: Philips Halogen T3 150W, 2400 lumens EFTA00606053 GENERAL ISLAND AREAS WEEKLY TASKS Pool Lights Pool Pump Pool Heater Outside Sconses Tree and Art/statue lights All light timer settings Check exposed wires Flood Lights Ceiling Lights Thermostats (Write temp setting) Run Faucets, Flush toilets, check for leaks Check door and window hardware G m 5 Palms Flagpole InfoCenter Tiki _i Helipad Kite House Tennis MAINTENANCE AREAS WEEKLY CHECKS R/O Plant according to maintenance schedule Generators according to maintenance schedule General clean up, tools, files, supplies Attach maintenance report EFTA00606054 MONTHLY LIGHT CHECKS All outdoor lights needs to be checked after dark one time per month. Use firs Monday of each month, or the following day if that particular Monday is a holiday. Check timers, light beam direction and rep ace broken fixtures and bulbs Date of last walk through Date: / Done by: REMARKS Checklist Completed by: NAME & DATE SIGNATURE EFTA00606055

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.