Case File
efta-efta00606404DOJ Data Set 9OtherDominik Ziewiec
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00606404
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Dominik Ziewiec
Ann: Richard Barnett
9 East 71 St.
Sept.09. 2008.
INVOICE 07
6th floor Media room, Cargo elevator and Kitchen area.
SCOPE for Media room ceiling:
- Protection of work area.
- Preparation of the cracks on the ceiling.
- Plaster work and spot primer.
- Sanding work (to smooth the surface).
- Repainting to match existing color (BM flat off white).
- Cleaning and removing debris from the area.
SCOPE for woodwork : 3 windows casing,
baseboard, door frames.
- Preparation of the woodwork.
- Primer work.
- Sanding work (to smooth the surface).
Repainting to match existing color and finish.
- Cleaning and removing debris from the area.
SCOPE for touch up walls in the Kitchen area:
APPROVED
SEP - 9 2001
RICHARD BARNETT
-
Protection of work area.
-
Touch up walls
- Cleaning and removing debris from the area.
Total amount due : S 3500.00
EFTA00606404
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.