Skip to main content
Skip to content
Case File
efta-efta00606404DOJ Data Set 9Other

Dominik Ziewiec

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00606404
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Dominik Ziewiec Ann: Richard Barnett 9 East 71 St. Sept.09. 2008. INVOICE 07 6th floor Media room, Cargo elevator and Kitchen area. SCOPE for Media room ceiling: - Protection of work area. - Preparation of the cracks on the ceiling. - Plaster work and spot primer. - Sanding work (to smooth the surface). - Repainting to match existing color (BM flat off white). - Cleaning and removing debris from the area. SCOPE for woodwork : 3 windows casing, baseboard, door frames. - Preparation of the woodwork. - Primer work. - Sanding work (to smooth the surface). Repainting to match existing color and finish. - Cleaning and removing debris from the area. SCOPE for touch up walls in the Kitchen area: APPROVED SEP - 9 2001 RICHARD BARNETT - Protection of work area. - Touch up walls - Cleaning and removing debris from the area. Total amount due : S 3500.00 EFTA00606404

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.