Case File
efta-efta00606407DOJ Data Set 9OtherDominik Ziewiec
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00606407
Pages
1
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Dominik Ziewiec
Attn: Richard Barnett
Proposal to repaint basement kitchen walls.
SCOPE for work:
9 East 71" .
Sep.16.2008.
1. Protection of work area.
2. Preparation of the walls.
3. Plaster work.
4. Sanding work (to smooth the surface).
5. Primer work.
5. Repainting to match existing color and finish.
6. Cleaning and removing debris from the area.
TOTAL PRICE FOR THE PROJECT: $ 2350.00
EFTA00606407
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.