Skip to main content
Skip to content
Case File
efta-efta00606407DOJ Data Set 9Other

Dominik Ziewiec

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00606407
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Dominik Ziewiec Attn: Richard Barnett Proposal to repaint basement kitchen walls. SCOPE for work: 9 East 71" . Sep.16.2008. 1. Protection of work area. 2. Preparation of the walls. 3. Plaster work. 4. Sanding work (to smooth the surface). 5. Primer work. 5. Repainting to match existing color and finish. 6. Cleaning and removing debris from the area. TOTAL PRICE FOR THE PROJECT: $ 2350.00 EFTA00606407

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.