Skip to main content
Skip to content
Case File
efta-efta00609128DOJ Data Set 9Other

Emad Hanna

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00609128
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Emad Hanna From: Monique Harry Sent: Thursday, July 01, 2010 2:53 PM To: Emad Hanna Subject: Uriel Caleb Attachments: Uhel R Caleb 6-29-10.pdf Emad, Attached for payment via Check Hi- Tech Concrete Pumping in the amount of $2,825.00. Project 1010 Code 03-362. Please make check payable to Uriel Caleb. Monique Your E-mail and More On-the-Go. Get Windows Live Hotmail Free. Sion uo now. 1 EFTA00609128 Mr Hi— Tech Concrete Pumping. LLC bate: [Cell: Job Name and Location: ime--xe Mix Type I 1 Cb.antity Fee (5) or DispatS -t , Setup Charge (1-15a_ / . .--) Arms." -• j 3000psie$16.00 iCubic Yards Poured I -----.2e, C.-, troy -.9.----1-r-1 Start 9561sie516.00 i Extra Pipe(s) / Hose(s) / S 1-155. 'est"' c c. I_H 50000psie&18.00 i Transportation , Frets r "" Grout e$14.00 iOvertime Surcharge . . Miselloncous !Total Yards ,.... 7 r Tiirotal Charges el g e2 r Miscellaneous ' /CYO, C 3. 34 4 Wilt- / 11/f/ 4 Additional Job Notes: Contractor to orovick I Grout to prime the pump and delivery system 2. Pump able concrete mix. 3. Labor for setup and cleanup of delivery system. Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates) 5. Responsibility for any loss of delivery systems (pipes, clamps. gaskets, elbows, hoses etc.). 6. Labor to man hose. 7. Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe). Terms of Payment Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of 1 5% per month if collection proceedings are initiated 'Note: Customers will be allowed ten (10) - Fifteen (15) minutes per truck (8-10 cubic yards) free unloading tune after arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rate of $75.00 per hoar. If driver is asked to drive off main road onto private property the customer accepts full responsibility for any arid all damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines, phone lines etc. We do every- thing possible to provide our customers with trouble free equipment: however Hi-Tech Concrete Pumping. LLC. Will not be held Liable for any loss time. Labor and/or materials due to any mechanical failure The person, corporation or entity signing this contract has full and complete authority to act for and on behalf of the owner and to legally bind the owner for the performance of this contact in its entirety By signing 'his contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi• Tech Concrete Pumping, LLC. at the rate specified for both the hourly rate and the per cubic yard rate but in no even less than the minimum specified rate. t [ general Terms & Conditions ea- enif /- I 6. , MINT I Herby certify that the above times and yardages are Hi. Tech Concrete Pumping LLC Has completed the job to the owner/contractors satisfaction for both the hourly rate and the per cubic yard rate but in no even less than ...5; 474.2 at the rate specific EFTA00609129

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.