Skip to main content
Skip to content
Case File
efta-efta00609134DOJ Data Set 9Other

Emad Hanna

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00609134
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Emad Hanna From: Monique Harry Sent: Thursday, Octoll i To: Emad Hanna Subject: Hi Tech Concrete Pumping Attachments: Hi Tech req 7 - 1010.pdf Emad, Attached for payment via check Hi-Tech Concrete Pumping LLC Req 7 in the amount of $2,115.00. Project 1010 Code 03-362. Monique L ~p~oow►) EFTA00609134 IMP Hi— Tech Concrete Pumping, LLC bate: Cell: JT: F: Lob Name and Locatior y_e Time Mix Type Quantity Fee (5) oispatch5-."*.;4, - Setup Charge (1-15) _...--- 7y —2.) Arrivaak.--: 5-5 3000psi@$16.00 Cubic Yards Poured i -75 — 77c 4 - Start f, 72) 4000psie$16.00 Extra Pipe(s) / Hose(s) ....- 5 — 1-15 97;2 d [email protected] Transportation Finish/, .4o Grout 6114.00 Overtime Surcharge Miscellaneous Total Yards 7 4..) Total Charges -- //i Miscellaneous • . Additional Job Notes: tDze:41 ...Sc1/0.0 General T Conditions Contractor to provide 1. Grout to prime the pump and delivery system. 2. Pump able concrete mix. 3. Labor for setup and cleanup of delivery system. (sb4L) yie/z) 0 3 IA fro 4. Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates). 5. Responsibility for any loss of delivery systems (pipes, clomps, gaskets, elbows, hoses etc.). 6. Labor to mon hose. 7. Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe). Terms of Payment Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of 1.5% per month if collection proceedings are initiated. *Note: Customers will be allowed ten (JO) - Fifteen (!5) minutes per truck (9-10 cubic yards) free unloading time after arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rate of $75.00 per hour. If driver is asked to drive off main road onto private property the customer accepts full responsibility for any and all damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines, phone lines etc. We do every- thing possible to provide our customers with trouble free equipment; however Hi-Tech Concrete Pumping, LLC. Will not be held Liable for ony loss time, Labor and/or materials due to ony mechanical failure. The person, corporation or entity signing this contract hos full and complete authority to act for and on behalf of the owner and to legally bind the owner for the performance of this contact in its entirety. By signing this contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi- Tech Concrete Pumping, LLC. at the rote specified for both the hourly rate and the per cubic yard rote but in no even less than the minimum :of& red rate. /Aar» 61. 1....rathirtir /7/ J.0 MINT SI ' E TIME CGOIA EMS SICNA fAf I Herby certify that the above times and yardages are Hi. Tech Concrete Pumping LLC. Has completed the job to the owner/contractors satisfaction. EFTA00609135

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.