efta-efta00609244DOJ Data Set 9Other

LSJ CONSTRUCTION

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00609244
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSJ CONSTRUCTION Subcontractor Payout Project: Main House Trade: Geotech Subcontractor Jaca & Sierra $6,800.00 Original Contract Sum: Change Orders Submitted & Approved: New Change Orders: Total Work Contracted to Date: Total Work Completed to Date: Less Retainage: Total Payments Made to Date: Total Current Payment Due: Balance to Finish including Retainage: Sales Tax Liability: Partial January 6, 2010 Requisition #2 Final X $2,000.00 $0.00 $8,800.00 100% $8,800.00 $0.00 $3,000.00 $5,800.00  $0.00 a. Subcontractor/Supplier is liable, explaii install only / tax included in contract b. Non-resident Subcontractor/Supplier Bond Applicable: c. Use Tax to be paid by our company: d. Shipping Total Outlays for this contract incl. Sales or Use Tax: None $8,800.00 JEE approval attached YES NO X Submitted Bill Signed: Date: January 6, 2010 Approved by: Emad Signed: Date: \\-\\‘° Invoice Attached YES NO X Approved by: Signed: Date: January 6, 2010 Approved by: Signed: Date: 45S 1011 0 1 - -1 EFTA00609244 LSJ CONSTRUCTION Project Main House Jbcontractor • full legal name: Jaca & Sierra Phase tf 01.807 Trade: Geotoch Invoice Requisition #2 Insurance expiation: Payment Partial Final X Invoice/Re:Ill Dale C/0 Amount Retainago Duo Paid Date Paid Choddi Balance Contract 10107/09 6.80000 CON1 CO#2 CO#3 CO#4 12/29/09 2.00000 .00#5 Requisition #1 Requisition #2 Requisition #3 Requisition #4 10'27100 1000.00 3.000.00 3,000.00 0.00 5.80000 5.800.00 5.800.00 - 0.00 - (Total 8.800.00 0.00 8.80000 3.000.00 5.800.00 Date Revised: January 6. 2010 Contract Amount - Phase contract COtil COQ CO#3 CO#4 CO#5 6.800 00 2.000.00 Geolechnical Exploration Extra day of ailing to gel required borings Description Description Description Desorption Contracted To Date Balance of Contract w/Retainage 8.800.00 EFTA00609245 JACA & SIERRA TESTING LABORATORIES OR9WalgE LA L.100 RED HOOK QUARTER r. A_ THLIMP,- Project :STRUCTURE LITTLE ST. JAMES, USVI FOR SERVICES RENDERED AS FOLLOWS FOR THE PERFORMANCE OF A GEOTECHNICAL EXPLORATION FOR THE PROPOSED STRUCTURE LITTL ST. JAMES, USVI. 12/29/2009 I 07f7c7P7 2 DAYS DRILLING CREW AND EQUIPMENT 1 LSUM MOBILIZATION INCLUDING AIRFARE AND SOIL SHIPPING 1 DAY FIELD ENGINEERING 20 HRS ENGINEERING TIME FOR REPORT PREPARATION Sub - Total TOTAL TO BE PAID DEPOSIT -t; jot ) iSidu I n€RET C ?tit PA, EMAATANDaWMUMAIMAT ['UM() CONDITIONS Upol: UNITPRICI AMOUNT 2,000.00DAYS 1,500.00LSUM $800.00DAY 4125.00HRS $4,000.00 $1,500.00 $800.00 $2, 500.00 08,800.00 -83,600.00 c5: see. 0 EFTA00609246 JACA & SIERRA TESTING LABORATORIES LAFAYETTE UUNTRAUTUH5, LLU 6100 RED HOOK QUARTER ST. A? TWIMAH :0'.0. Pic: loci :STRUCTURE. LITTLE ST. JAMES, USVI FOR SERVICES RENDERED AS FOLLOWS FOR THE PERFORMANCE OF A GEOTECHNIGAL EXPLORATION FOR THE PROPOSED STRUCTURE LITTL ST. JAMES, USVI. DAYS DRILLING CREW AND EQUIPMENT 1 LSUM MOBILIZATION INCLUDING AIRFARE AND SOIL SHIPPING 1 DAY FIELD ENGINEERING 20 HRS ENGINEERING TIME FOR REPORT PREPARATION Sub - Total TOTAL TO BE PAID DEPOSIT 73ZICIV0CE is JUST AND CORRECT AND THAT ear,A. necceve CUSTOMER DEWO0@lo, 12/29/2009 0036202 J CONUNriiNS Upon Receipt 2,000.00DAYS 94,000.00 1,500.00LSUM 91,500.00 1 9800.00DAY 8800.00 8125.00HRS 52,500.00 r 98,800.00 -93,000.00 $5,800.00 EFTA00609247

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.