Case File
efta-efta00610262DOJ Data Set 9OtherSubbase Drydock
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00610262
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Subbase Drydock
T:
Fax:l
Box 304429
St. Thomas, USVI 00803
Name /Address
LSJ,LLC
"Big N"
Anna:
Estimate
Date
Estimate #
8/31 2017
915
Terms
Project
Upon Comple...
Description
Qty
Cost
Total
Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part
epoxy paint. Includes Labor and Materials.
I 12,340.00
12,340.00
Fabricate and weld splash guards into place to minimize water intrusion through the front ramp.
I
7,500.00
7,500.00
Prime and paint for increased longevity.
Prep and grind cracks throughout vessel.
Includes Labor and Materials.
Both cutless bearings are worn and not within tolerance. We recommend changing these while
hauled out. We also recommend checking the engine alignment while hauled out to ensure there
are no issues with the drive train. Includes Labor and Materials.
I
3,750.00
3,750.00
Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of
waste oil after clean up.
I
3,750.00
3,750.00
Total
s.27.34ii.lio
Signature
EFTA00610262
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.