Skip to main content
Skip to content
Case File
efta-efta00610262DOJ Data Set 9Other

Subbase Drydock

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00610262
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Subbase Drydock T: Fax:l Box 304429 St. Thomas, USVI 00803 Name /Address LSJ,LLC "Big N" Anna: Estimate Date Estimate # 8/31 2017 915 Terms Project Upon Comple... Description Qty Cost Total Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part epoxy paint. Includes Labor and Materials. I 12,340.00 12,340.00 Fabricate and weld splash guards into place to minimize water intrusion through the front ramp. I 7,500.00 7,500.00 Prime and paint for increased longevity. Prep and grind cracks throughout vessel. Includes Labor and Materials. Both cutless bearings are worn and not within tolerance. We recommend changing these while hauled out. We also recommend checking the engine alignment while hauled out to ensure there are no issues with the drive train. Includes Labor and Materials. I 3,750.00 3,750.00 Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of waste oil after clean up. I 3,750.00 3,750.00 Total s.27.34ii.lio Signature EFTA00610262

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.