Skip to main content
Skip to content
Case File
efta-efta00611158DOJ Data Set 9Other

VP-BBJ MAITENANCE REQUIREMENTS

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00611158
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
VP-BBJ MAITENANCE REQUIREMENTS The Base Maintenance checks are carried out at 6 monthly intervals, usually August/February. 'A'1 Check 6 month Due Aug 2011 'A'2 Check 12 month Due Aug 2011 'C'1 Check 36 month Due Aug 2011 'C'2 Check 72 month Due Aug 2011 'C'3 Check 144 month Due Aug 2011 Line maintenance items carried as and when required. Monthly check: performed each calendar month (package). 3 monthly items: service Heads Up Display overhead unit desiccant capsule. 150 hrs items: LJH / R/H Engine FMC CDU Bite check. 300 hrs items: CVR operational test 400 hrs items: IDG oil level & Delta P Indicator Maintenance requirements for 2010/2011. Al, A2, C1, C2 & C3 Checks due in August 2011, to be performed. During this maintenance visit all required AD's, Service Bulletins and Service Letters will be performed. In August 2011 during the C3 check (144 month), Main & Nose Landing Gear will be removed for overhaul. EFTA00611158

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.