Case File
efta-efta00611158DOJ Data Set 9OtherVP-BBJ MAITENANCE REQUIREMENTS
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00611158
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
VP-BBJ MAITENANCE REQUIREMENTS
The Base Maintenance checks are carried out at 6 monthly intervals, usually
August/February.
'A'1 Check
6
month
Due Aug 2011
'A'2 Check
12 month
Due Aug 2011
'C'1 Check
36 month
Due Aug 2011
'C'2 Check
72 month
Due Aug 2011
'C'3 Check
144 month
Due Aug 2011
Line maintenance items carried as and when required.
Monthly check: performed each calendar month (package).
3 monthly items: service Heads Up Display overhead unit desiccant capsule.
150 hrs items: LJH / R/H Engine FMC CDU Bite check.
300 hrs items: CVR operational test
400 hrs items: IDG oil level & Delta P Indicator
Maintenance requirements for 2010/2011.
Al, A2, C1, C2 & C3 Checks due in August 2011, to be performed.
During this maintenance visit all required AD's, Service Bulletins and Service Letters will be
performed.
In August 2011 during the C3 check (144 month), Main & Nose Landing Gear will be removed for
overhaul.
EFTA00611158
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.