Zorro Projects - 5/4/13

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00624854
Pages
5
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Zorro Projects - 5/4/13 Main House - Outside Start End Total Est. Cost Notes Landscaping - Proposals & Maintenance from 3 companies forwarded to RK & Rear Planter Bed DI - 3/28/13 Front & Rear Parking Beds Bowel Garden 'JE approved 4/27/13, Aspen Landscaping received the contract to refurbish. Aspen Grove New proposal received 5/3/13 will review & forward 5/6/13 Pinion Screen Landscape Lighting Timers - ;JE approved 4/27/13 to replace Timers Landscaping - In House - JE approved 4/27/13 to remove existing Ponderosa Pines, Landscape Lights & to relocate Pinions to the area. Ponderosa Pines & Landscape Lights at Front Entrance Removal of Dead Pine in Front Courtyard. CAN WE PROCEED WITH REMOVAL Bid Received 12/12/12 - Approved 3/20/13 Terraces - Three B's 4/7/13 $56,200.00 Terraces - $52,000.00 Stucco/Gutters/Painting - $4,200.00 Library Terrace Membrane - installed. Stucco to be completed once MBR Terrence membrane is installed MBR Terrace Demo complete. Work continues $36,400.00 'Bid Stucco Work - Three B's 4/7/13 Received 3/1/13 - Approved 3/20/13 Site Walls Wall Stucco Patching & Painting 90% complete Columns Columns Stucco & Painting 90% complete Attached Photos Estancia Fountain - $2,500.00 Bid received 3/1/13 Bowl Lift - $1,220.00 JE approved 4/27/13 Electrical - $880.00 Pump - $400.00 4/29/13 - Brice determined that the leak is the main line going to the upper bowl. Proposed repair is to isolate leaking line & use return line to lower bowl, splitting line to feed upper bowl. This will mean we will continue using existing pump & filter. Will forward cost 5/9/13 EFTA00624854 Zorro Projects - 5/4/13 Chess Fountain - Requires resurfacing JE approved 4/27/13 Bid will be forwarded 5/10/13 Ranch Front Gates - Received bid 4/20/13, have requested vendor to make adjustments, new bid received 5/3/13, reviewing JE approved 4/27/13 New Gate Openers Main House - Inside Start Total Est. Cost Notes Cooling Tower - 4/24/13 - RK approved bid from SPX & JBH. RK has all cost details 5/3/13 - Deposit was to be forwarded Replacement of Pool Pac - 9/11/12 4/29/13 - Quote forwarded to RK, who requested more detail, will forward once in hand Engineering Inspection - $5,000.00 Unit Cost - $43,170.00 Ducting - TBA Re • air of Pool Pac - 3/15/13 Unit working on fan only, proceeding with replacement of Pool Pac Repair Pool/Spa - Vendor on site 4/8/13 to review scope of work Water Sample of Tap Water - 4/27/13 - JE requested water samples be taken. This will be completed by the end of the coming week once water system is balanced - Dakota Well/RO went on line 5/3/13 Exterior Doors - JE requested 4/27/13 that all saddles on exterior doors be adjusted so doors will close correctly. Will be completed once Terraces etc. complete Audio Upgrade - Installed - final programming required Installed - Programming of remotes required New TV's DVD Players/Theater Upgrade EFTA00624855 Zorro Projects - 5/4/13 Kitchen Table Electrical - Three B's Bid Received 3/1/13 Lead Time 1 Week Need to review design and floor Electrical & Data Cut In - $2,160.00 Media Room - New Curtains/Blackout 2/24/13 JE selected fabric 4/27/13. Amount required has been placed on hold. 2 companies will be submitting a bid by 5/9/13 Sarah's Office - New Curtains/Lined 2/24/13 JE selected fabric 4/27/13. As of date manufacturer cannot provide enough yardage, they will forward an update 5/6/13 Gym - Mirrored Doors - Backed/Framed 2/24/13 3 B's completed, JE requested further work, will review with vendor IT & Phones Start End Total Ed. Cost Notes 4/27/13 JE approved the installation of new phones at MH Reviewing new scope of work - Microwave option Cell Repeaters & WI-Fl Start End Total Bt. Cost Notes Cell Repeater - Library Will have installed by 5/9/13 Cell Repeater- Gym Will be completed with Audio install Sound System - Gym Requires refurbishment to accept I Pad Computers Lap Top - Lodge Desk Top - Office REQUESTING APPROVAL TO PURCHASE Well K Start En Total Est. Cost Notes Plugging First Hole - $15,000.00 Multi Media Filters & Install - $5,844.57 Transponder & Install - $1,700.00 Mis Pipe & Fittings - $1,000.00 Windows Laptop - $700.00 4/27/13 5/3/13 $620.56 JE approved 4/27/13 5/3/13 - Multi Media Filters ordered 5/8/13 - Transponder to be installed 5/3/13 - Laptop purchased Dakota RO Water Softener Start End Total Ed. Cost Notes 2/18/13 5/3/13 $3,045.45 Complete - Well & RO on line as of 5/3/13 Lodge Start End Total Est. Cost Notes Roof - Repair/Replace Broken Sections 11 will complete while on site for upcoming projects EFTA00624856 Zorro Projects - 5/4/13 Log Cabin Start End Total Est. Cost Notes Step Outside - Repair/Replace 2/24/13 NA Caboose Start End Total Est. Cost Notes Outside Wall - Installation of Retaining Wall NA Yurt Start End Total Est. Cost Notes Yurt - Replace Walls/Roof/Door/Windows $6,355.00 plus shipping charges of approx. $480.00 JE approved 1/12/13. Vendor forwarded quote 5/3/13 - lead time after payment 8 to 10 weeks. Floor will need to be sanded and resurfaced REQUESTING APPROVAL FOR 50% DEPOSIT Flay Barn Start End Total Est. Cost Notes Paint 4/8/13 NA Work to begin 5/9/13 Greenhouse Start End Total Est. Cost Notes Paint-Outside 3/24/13 4/29/13 $390.00 Complete Bunkhouse Start End Total Est. Cost Notes Paint - Window Frames & Sills 2/24/13 NA Walls completed, working on window frames & sills Window/Doors - Total Replacement 2/6/12 Will Budget for 2014 Reservoir Start End Total Est. Cost Notes Paint - Tank 2/24/13 NA Will start once Bunkhouse & Haybam complete Vehicles Start End Total Est. Cost Notes 2013 Ford Expedition - review Captain Seats to be installed 3/27/13 Estimate received 5/2/13 - $11,528.74 Awaiting 2nd estimate 2008 Dodge Dually -Service/Repair $3,509.55 Complete M2 Start End Total Est. Cost Notes JE approved 4/27/13 investigating purchase of 2 dogs. Researching EFTA00624857 Zorro Projects - 5/4/13 Purchases White Rug - Gym (10 x 12) JE approved 4/27/13 to move ahead with Robert's Flooring to manufacture a rug using carpet. Estimate expected 5/10/13 Big Urns - Outside MH JE approved 3/27/13 - Terre Cotto Outside Pool Furniture Large Chrome Pool Clock Facial Machine Sue & Karyna to purchase EFTA00624858

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.