Skip to main content
Skip to content
Case File
efta-efta00660199DOJ Data Set 9Other

From: BMG

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00660199
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: BMG To: J Epstein <[email protected]> Subject: Fwd: Re: Date: Mon, 23 Apr 2012 13:15:40 +0000 Sent from my iPhone Begin forwarded message: From: Date: April 22, 2012 10:43:30 AM GMT-04:00 To: brice gordon Cc: Arran Mc Ginnis TOM MELNICK < >, Daphne Wallace Subject: Re: Good Morning to All, Please note below - changes/additions/updates. Daphne could you please update the Punch List to reflect these points, please call if you require more details Wannest regards always On Sun, Apr 22, 2012 at 10:14 AM, On Sat, Apr 21, 2012 at 4:35 PM, > wrote: > wrote: 5 Palms - Desk to be sent from NYC - Sarah will make arrangements Outside Light Boxes on back & front walls to be covered over Lights - light Parrots and building - from roof line (retangler 24 x 10) lighting to be installed in ceiling - 4/23 Outside Coral stone seat - Brice will forward changes to Tom Retaining Wall requires layout Concrete Benches need placement Grade require flatten/building up Relocate grasses from Beach - JE will select location Generator Pad - 24th Mirrored Siding due on site 4/24 Cabinets/Shelves - to be completed by Bill Doors - will confirm delivery date 4/23 Fire Box - requires construction with Mexician Tile on floor area Painting - Final outside coat to be completed once all work as finished Level Dirt/Trees - 30th Grotto - Road to mimic Starfish Market EFTA00660199 Concrete pour 23th - complete 25th More dirt required on left hand side as you look down, then hydroseed Shutters/Generator Doors/Storage Doors - to be completed by John Flagpole Pool - Palm lighting starts 4/23 Bern - Crusher Runs, place inside Berm Area 50 Planter Boxes require construction - size to be determined by JE Relocate Tie Downs to Engineering Main Compound - Plant Goats Foot Vine on hillside Repairing of coral stone deck areas Coral Stone Threshold's in guests rooms need to be cut Table on dock - final size to be determined - to be completed by John coral stone top Dock - Redo entry. Brice to source dock wood locally Enginerring - Area needs to be leveled and metal shed to be laid out Old Floating Dock - move to high road Hanger - 2 x Queen Beds/Frames - purchase 4/26 Coconut Drawers, relocate to Hanger 4/26 LSJ,LW Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: LSJ, LLC Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: EFTA00660200 LSJ,LLC Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: EFTA00660201

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.