Skip to main content
Skip to content
Case File
efta-efta00665950DOJ Data Set 9Other

From: "Gary Kemey"

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00665950
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Gary Kemey" To: "Jeffrey Epstein" <[email protected]> Cc: "Emad Hanna" aa Subject: Date: Mon, 16 May 2011 18:38:33 +0000 schedule for the 4th Main pool the building slab will be poured and block going up the pool equipment will be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes after the building is stoned) still on target for 10/3 Flag pole pool the building will be framed in and plastering underway the pool equipment will be in and water in the pool (assumes we get tile selection) the deck will be concrete(tile happens after shelter and plaster) walls will be underway still on target for 9/15 EFTA00665950

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.