Skip to main content
Skip to content
Case File
efta-efta00671761DOJ Data Set 9Other

DS9 Document EFTA00671761

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00671761
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: Cc: Subject: Date: Attachments: Daphne Wallace Jeffrey Epstein <[email protected]> Cleanup of the Engineering shed bays - July 31, 2012 Tue, 31 Jul 2012 21:52:04 +0000 Bay_In new_Engineering_storage_(1).JPG; Bay_In new_Engineering_storage_(2).JPG; Bay_In new_Engineering_storage_(3).JPG; Bay_2n new_Painting_storage_(1).JPG; Bay_2_-_new_Painting_storage_(2).JPG; Bay_2_-_new_Painting_storage_(3).JPG; Bay_3_- new Landscaping_storage_(1).JPG; Bay_3_-_new_Landscaping_storage_(2).JPG; ilayi t new_Landscaping_storage_(3).JPG; Bay_4n old_Engineering_office_(1).JPG; Bay_4_-_old_Engineering_office_(2).JPG; Bay_4n old_Engineering_office_(3).JPG; Bay_4_-_old_Engineering_office_(4).JPG; Bay_5n old_Desal_(1).JPG; Bay_5_- _old_Desal_(2).JPG; Bay_5_-_old_Desal_(3).JPG; Bay_5_-_old_Desal_(4).JPG Greetings Mr. Epstein, I spoke with Danny this afternoon regarding your directive for cleaning up the 5 storage bays in the Engineering shed. Outlined below is his plan, for your review, comments and approval: Bay 1 (new Engineering storage): Build in the shelving Paint the walls and shelves Brian will create a cement cap for the air vent on the back wall Bay 2 (new Painting storage): Complete the shelving Paint the walls and shelves Cement cap for the air vent on the back wall Bay 3 (new Landscaping storage): Build the shelves Paint the walls and shelves Cement cap for the air vent on the back wall Bay 4 (Old engineering office - probably will become additional engineering storage) Build a subwall to hide the old electrical - there must still be an access panel because this electrical is still in use powering the Manager's cottage and Danny will rewire it to also power the Engineering shed - shelving will be built on the subwall The existing shelving to the left will be cleaned up and additional shelving added The Chromix presently stored in this bay will be discarded - it was purchased to complete the main entrance, before the plan was changed to apply the "Devil Mix" gravel instead Bay 5 (Old desal - probably will become additional engineering storage) Danny plans to completely dismantle the old plant Build shelving Paint walls and shelves The floors in all of the bays are currently tiled. In two of the bays the floors were leveled/filled during the wall repair. Danny had no plans to retile the floors. He also plans to rewire all 5 storage bays. EFTA00671761 Danny presently does not have a timeframe for your review and approval for completing what is outlined above, but will work on it this week. Currently, Clement and Benny are fabricating the doors. They will start on the framing tomorrow. I asked if having the doors on the old engineering and desal bays will pose a problem when the interior construction and dismantling begins. They will not because the door hinges will allow for the doors to be removed and replaced easily so they are out of the way. Danny believes the water on the floor in the old desal bay is due to a leak, which he will address when the desal is dismantled. The water at the entrance of the bays not under the shed is due to rain going in, which will be prevented once the doors are in place and sealed. Respectfully submitted, Daphne EFTA00671762

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.