Skip to main content
Skip to content
Case File
efta-efta00722041DOJ Data Set 9Other

Estate Reports

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00722041
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Estate Reports Page 1 of 3 Home Documents and lists Create site Settings Help Select a View All Events Calendar Current Events JE Report Active Projects Estate Report Summary Actions o Alert me es Export to spreadsheet o Modify settings and columns Little St. James Estate Reports Up to Epstein Interests Intranet PI rnNew Item I Viiter I . - 0 2 Edit In Datasheet I :Blink to Outlook Status Info/Status Info/Status Pro) No. ProJ Name 304 Midnight Express Hard Top & Engines 338 New Roads and Walkways Into/Status 347 Wall Building Info/Status Info/Status 355 Are Pit 358 LS) Garden Info/Status 367 Solar Info/Status 371 Heti Pad/Car Park Information Responsobility Pnoto/Attc.n JE Directive /E Comments Count = 5 6/08/09 - JEE ordered new Midnight Emad Express 39' 06/08 Review Mock up with Stephan Silvina Caplinger this week New cistern started at Pop's garden - drainage into garden from road Retaining wall / steps at Nursery - 6x6 wood - prevent mud from coming into nursery and onto beach. Grading and swall at Info Shed - prevention measure - washout hillside below upper terrace entrance area. JEE requested roads be graded and edged where possible 6/1- Work continues at hell pad, west Curtis road & at fork near helipad and gym. 6/8 - Omar continues Helpad wall Fabian continues repladng wall at intersection of main road and helipad road Shlingford continues wail west road - west of rock falls 6/8 - Concept of boardwalk submitted to SlivIna JEE on 6/3/09 - review with Stphen Caplinger to be 6.10.09 on site 6/8/09- Plan submitted 06.03.09 Silvana nursery into twit and vegetable garden, to Install new fruit tree aloe, new stair through banana plantation and boardwalk leading to fire pit. 6/8 - Installation complete Curtis 6/1 - Awaiting further design Silvana development from Gensler. No Yes Yes No No No No Intn://welisrve 1 Asia ists/Ilcutte%2OR enorts/.1P4.20Rennrt.nsnx ?ShowInf i rid= HIT/II . 6/11/2009 EFTA00722041 Estate Reports Page 2 of 3 Info/Status 372 Dogs Info/Status Info/Status 373 Microwave Tower 374 Crew Boat - Purchase Info/Status 375 Master Suite Refurbishment Info/Status 378 Kitchen Build Out Info/Status 379 11KI HUT - regained • make fresh law Info/Status 380 East Flag HouseStew Info/Status 381 NANA refurbish I rtrw Info/Status 382 Dave Christopher's House! HEW Info/Status Info/Status Info/Status 383 Move or sell cars !icy. 384 New Apartments ! few 385 Furniture Placement hew 5/25 • JEE requested that we review Brice No options for Dogs 6/16 5/25 - AT&T proposal expected 6/18 Brice No 6-08 - Larry to bid $100,000 for P.B Curtis No Protector Crew boat bought by someone else, no longer available 6/08 • Building permit redeved 6/3/09 • Curtis No Foundation work to start 6/12/09. Budget not approved as of 06.10.09 Revised schedule requested by JEE 6/08 - Kitchen rebuild & Plans on hold • Silvina JEE directed painting of Cabinets, Installation of Unolium (previously purchased) - AC unit restoreded to operation • Oven parts on order - Ice machine to be repaired. 06/08 - Brian to test stain color and set Curtis up Gery _ Stephen Caplinger reviewed with Curtis on site Stephen Caplinger confirmed hydroseed of area whale plan being developed noted need for wash basin & chemical toilet - no piped In water 06/08 • Nana to be re-tubed and re- Curtis engined and refurbished. Carlos stripped out interior and purchased teak for new decking - also purchased new instilment panel. 06/08 - & Slivina visited Curtis site 08-09- , choose colors and fixtures. Curtis to prepare for Crew to clean and prepare for renovation 06/08 • cars in PB to be sold or shipped Brice 06/08 - Jeanne looking for apartments for Curtis architects to stay while visiting. 06/08 • Molynuex to work withMto Curtis locate furniture during visit week of 17th No No No No No No No NO Approved httn://welisrvOl/Isi/T.istsfEsoue%2ORennrtillE%2ORenort.asnx?ShowInGrid=HTMI. 6/11/2009 EFTA00722042 Estate Reports Page 3 of 3 Info/Status 386 Landscape master 06/08 - Stephan Caplinger drawing up SlivIna No plan !new master plan of whole island httn://wehsrv0 I Isill-ists/Fstate%2ORennistll:.%2ORennrt.asnx?ShowInCirid=lITMI. 6/I I/2009 EFTA00722043

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbishment
Wire Refrefurbish
Wire Refrefurbished

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.