Case File
efta-efta00722041DOJ Data Set 9OtherEstate Reports
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00722041
Pages
3
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Estate Reports
Page 1 of 3
Home Documents and lists Create site Settings Help
Select a View
All Events
Calendar
Current Events
JE Report
Active Projects
Estate Report
Summary
Actions
o Alert me
es Export to
spreadsheet
o Modify settings
and columns
Little St. James
Estate Reports
Up to Epstein Interests Intranet
PI
■
rnNew Item I Viiter I
.
-
0
2
Edit In Datasheet I :Blink to Outlook
Status
Info/Status
Info/Status
Pro) No. ProJ Name
304 Midnight Express
Hard Top & Engines
338 New Roads and
Walkways
Into/Status
347 Wall Building
Info/Status
Info/Status
355 Are Pit
358 LS) Garden
Info/Status
367 Solar
Info/Status
371 Heti Pad/Car Park
Information
Responsobility Pnoto/Attc.n JE Directive /E Comments
Count = 5
6/08/09 - JEE ordered new Midnight
Emad
Express 39'
06/08 Review Mock up with Stephan
Silvina
Caplinger this week
New cistern started at Pop's garden -
drainage into garden from road
Retaining wall / steps at Nursery - 6x6
wood - prevent mud from coming into
nursery and onto beach.
Grading and swall at Info Shed -
prevention measure - washout hillside
below upper terrace entrance area.
JEE requested roads be graded and edged
where possible
6/1- Work continues at hell pad, west
Curtis
road & at fork near helipad and gym.
6/8 - Omar continues Helpad wall
Fabian continues repladng wall at
intersection of main road and helipad
road
Shlingford continues wail west road -
west of rock falls
6/8 - Concept of boardwalk submitted to SlivIna
JEE on 6/3/09 - review with Stphen
Caplinger to be 6.10.09 on site
6/8/09- Plan submitted 06.03.09
Silvana
nursery into twit and vegetable garden,
to Install new fruit tree aloe, new stair
through banana plantation and boardwalk
leading to fire pit.
6/8 - Installation complete
Curtis
6/1 - Awaiting further design
Silvana
development from Gensler.
No
Yes
Yes
No
No
No
No
Intn://welisrve 1 Asia ists/Ilcutte%2OR enorts/.1P4.20Rennrt.nsnx ?ShowInf i rid= HIT/II .
6/11/2009
EFTA00722041
Estate Reports
Page 2 of 3
Info/Status
372 Dogs
Info/Status
Info/Status
373 Microwave Tower
374 Crew Boat -
Purchase
Info/Status
375 Master Suite
Refurbishment
Info/Status
378 Kitchen Build Out
Info/Status
379 11KI HUT -
regained • make
fresh law
Info/Status
380 East Flag
HouseStew
Info/Status
381 NANA
refurbish I rtrw
Info/Status
382 Dave Christopher's
House! HEW
Info/Status
Info/Status
Info/Status
383 Move or sell
cars !icy.
384 New
Apartments ! few
385 Furniture
Placement hew
5/25 • JEE requested that we review
Brice
No
options for Dogs 6/16
5/25 - AT&T proposal expected 6/18
Brice
No
6-08 - Larry to bid $100,000 for P.B
Curtis
No
Protector
Crew boat bought by someone else, no
longer available
6/08 • Building permit redeved 6/3/09 •
Curtis
No
Foundation work to start 6/12/09.
Budget not approved as of 06.10.09
Revised schedule requested by JEE
6/08 - Kitchen rebuild & Plans on hold •
Silvina
JEE directed painting of Cabinets,
Installation of Unolium (previously
purchased) - AC unit restoreded to
operation • Oven parts on order - Ice
machine to be repaired.
06/08 - Brian to test stain color and set
Curtis
up Gery
_ Stephen Caplinger reviewed with Curtis
on site
Stephen Caplinger confirmed hydroseed
of area whale plan being developed
noted need for wash basin &
chemical toilet - no piped In water
06/08 • Nana to be re-tubed and re-
Curtis
engined and refurbished.
Carlos stripped out interior and purchased
teak for new decking - also purchased
new instilment panel.
06/08 -
& Slivina visited
Curtis
site 08-09-
,
choose colors and
fixtures. Curtis to prepare for Crew to
clean and prepare for renovation
06/08 • cars in PB to be sold or shipped
Brice
06/08 - Jeanne looking for apartments for Curtis
architects to stay while visiting.
06/08 • Molynuex to work withMto
Curtis
locate furniture during visit week of 17th
No
No
No
No
No
No
No
NO
Approved
httn://welisrvOl/Isi/T.istsfEsoue%2ORennrtillE%2ORenort.asnx?ShowInGrid=HTMI.
6/11/2009
EFTA00722042
Estate Reports
Page 3 of 3
Info/Status
386 Landscape master
06/08 - Stephan Caplinger drawing up
SlivIna
No
plan !new
master plan of whole island
httn://wehsrv0 I Isill-ists/Fstate%2ORennistll:.%2ORennrt.asnx?ShowInCirid=lITMI.
6/I I/2009
EFTA00722043
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Wire Ref
RefurbishmentWire Ref
refurbishWire Ref
refurbishedRelated Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01578720
1p
DOJ Data Set 9OtherUnknown
From: "Stephen Caplinger"
1p
DOJ Data Set 11OtherUnknown
EFTA02427492
1p
DOJ Data Set 11OtherUnknown
EFTA02436651
1p
DOJ Data Set 9OtherUnknown
From: Jeffrey Epstein <[email protected]>
1p
DOJ Data Set 9OtherUnknown
From: Jeffrey Epstein <[email protected]>
1p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.