Skip to main content
Skip to content
Case File
efta-efta00731690DOJ Data Set 9Other

Three B's LLC

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00731690
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 Invoice Brice Gordon do Zorro Ranch Stanley, New Mexico Brice, Here is the price for lowering the fountain in the Estancia Phase 1 Support fountain bowl with I-beams and heavy duty material lifts (4) Saw cut grout joint Raise bowl and remove middle piece of fountain Lower bowl and set into place for owner to approve Phase 2 Support fountain bowl with I-beams and heavy duty material lifts (4) Raise fountain and apply grout Lower fountain and level Fill bowl to check for uniformity of water flow around the perimeter of bowl. Some grinding may need to be done to achieve water flow. Project should take about 3 day's total Includes; material, labor, equipment to complete project Excludes; electrical and plumbing Price $ 2,450.00 plus tax Total $ 2,621.50 **We had additional labor, materials and equipment rentals to lower the bowl to its final position after meeting with Mr. Epstein. $1,180.00 plus tax Total $1,262.00 Final total $ 3,383.00 Call me if you have any questions at Thank you, JJ Blea EFTA00731690 Managing Member EFTA00731691

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.