Skip to main content
Skip to content
Case File
efta-efta00753323DOJ Data Set 9Other

From: "Abram Muljana" <tMl

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00753323
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Abram Muljana" <tMl > To: "Gary Kerney" "Shelley" Cc: "IIMMI " <Ma, "Jeffrey Epstein" <[email protected]> Subject: LSJ - Notes Date: Fri, 28 May 2010 20:50:01 +0000 Attachments: Comments_on_A002_-_052810.pdf Gary: Shelley: Comment as discussed referring to revised Drawings dated 052710 sent Thursday afternoon (Not the previous set of drawings sent & dated May 20): No terraces or planters with retaining walls between the Pool building and Cinema . A-00I, A-002, and A-003 (052710) Additional Guest Bedroom by the north side of the Living Area will be underground, totally invisible from above. Access noted on the additional space north of existing small office: "Future location of Stairs" (Drawing A-003 - 052710) Programme for Entry Pavilion for the Pool: Is the Lounge can be used as a small office/massage area? (Drawing A-003 - 052710) The interior stairs on the north side is going to the water treatment room in the basement. The massage rm./small office on the north-east corner of the Pool might become an open terrace. Access to Pool Pavillion: Secondary entry on the north, by the terrace; Main entry on the south, by the lawn. (Drawing A-003 - 052710) Pool Pavilion's ground is about 4'-6" below the current livingroom terrace, hence the stairs outside form the terrace to secondary entry (@north) Master Bathroom general Finish: Mont Blanc Glass Stone by Coverings ETC - Gary has been in contact with supplier in NY; Accent walls surrounding tubs, shower, steam room and general floor: Marble (TBD) - Shelley and RCI will shop for more samples. Master Bathroom: Current layout: bathtub is not on axis with the entry door. The middle marble paneled (elevation E2 and E6/A-005-052010) is on axis of the entry door, with R+L uninterrupted seams travelling down to the tub deck and apron. This marble panel is right across from the door entering the bathroom. Need an optional layout with a large corner tub. Noted. New Reflected Ceiling Plan. Noted. Need flat/low small cornice detail between the stone glass walls and existing cedar ceiling. Noted. Steam Room: Lower ceiling to 7'-6". Noted. Exterior walls enclosing steam room can be dropped below existing comice/gutter. Living Area: Larger middle door at the rear (facing the sea) flanking by two smaller doors; Need to revise rhythm of stone columns. Noted. Kitchen: Double acting doors to Pantry has to be attractive or hidden behind cabinetry. Kitchen designer and manufacturer has been selected (same as the one used in Santa Fe (?)) EFTA00753323 . Access from Living Area/Kitchen to Master Bedroom Suite and Library; To be revised as per Gary's sketch (enclosed). Noted. I'll be out of town and be back in the office on Wednesday. Have a wonderful Memorial Day Weekend! Best, ABRAM MULJANA ROBERT COUTURIER. INC. 69 MERCER STREET. 3RD FLOOR NEW YORK. NY 10012 WWW.ROBERTCOUTURIER.CONI OFFICE: x 16 FAX: EFTA00753324

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefReflected
Wire Refreferring

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.