Skip to main content
Skip to content
Case File
efta-efta00766916DOJ Data Set 9Other

From: "William Murphy"

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00766916
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "William Murphy" To: "Jeevacation" <jeevacation®gmail.com> Cc: "Brice Gordon" cza "Gary Kerney" Subject: LSJ Visit Date: Mon, 14 Dec 2009 18:59:01 +0000 Sir, The PR Fiber technicians I met with last Tuesday submitted a quote late Friday afternoon detailing the task list outlined during their visit. Quote was for 15K and did not include accommodations while on St Thomas (I had indicated that we may be able to offer accommodations at the Elysian hoping to save some of the cost). I explained this was substantially higher than we had anticipated spending on this project and was answered by the company president that this is their standard rate used for WAPA and VITELCO. Assuming that we were to complete this work, we still have not verified that the undersea cable is without fault. Bonneville construction suggested we do test this prior to repairing the splices in St Thomas and LSJ and is going to send pricing later today or tomorrow for that task which was not part of the original quote. Bonneville Construction has indicated that they should be able to assist us the third or fourth week of January assuming we have prepared the new runs as expected. I contacted Val-Comm at Brice's suggestion Friday afternoon and asked what I should expect to pay for such a task. I am to follow up with Paul later today for more information. Gary Moses was able to swap out the replacement power supply on the BCM 400 Thursday afternoon. The device still does not power up. Most likely we will have to replace the telephony system as a result. I am getting a button layout from the previous system to Richard at ValComm to ensure that there will be no feature loss in transitioning to the VoIP system they are recommending for LSJ/Zorro. Fiber cable was purchased under the laundry expansion project and is expected to be to the island the first week of January. Work has begun to install conduit that will hold the fiber cable. The new fiber cable will be installed into the island conduit once delivered. I met with Mr. Kerney Wednesday morning and am preparing a project plan and build out for our IT room in the new mechanical building. I anticipate having this to him by the end of the week. I will cc you this information when delivered. I should be able to deliver numbers for the moving to the new IT space and terminating our new fiber infrastructure at that time. Just wanted to keep you up to date, EFTA00766916 William Murphy Systems Administrator — HBRK Associates EFTA00766917

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domaingmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.