Skip to main content
Skip to content
Case File
efta-efta00770075DOJ Data Set 9Other

From: "Stephen Caplinger" <

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00770075
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Stephen Caplinger" < To: "'Jeffrey Epstein"' <[email protected]> Cc: "'Gary Kerne 1" Subject: FW: Hammam Date: Fri, 11 Sep 2009 12:37:12 +0000 Attachments Inline-Images , "'hasan khan" Jeffrey: Attached are the revised Hammam site plan and a sketch of the entry court. Please note that we have revised the entry road to come in directly from the north on center with the main portal door way. I believe this alternative makes much more sense and creates a nice entrance courtyard in an Islamic Garden style. The courtyard walls help to block the wind and create enclosure. We can include windows in the walls if we want to have views out. I have also eliminated the earthwork mound on top of the ridge to the East and created terraced lawn areas. Also, the other exterior spaces are shown including a parterre garden court to the north and a raised palm court to the northwest. This raised palm court blocks the negative view to St. Thomas. I will bring full size drawings on Monday. Let me know what you think. STEPHEN M. CAPLINGER Vice President Design & Planning LANDMARK LAND COMPANY EFTA00770075

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.