Skip to main content
Skip to content
Case File
efta-efta00812932DOJ Data Set 9Other

From: Richard Kahn

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00812932
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Cc: Subject: Fwd: LSJ - GSJ Solar Date: Fri, 04 Nov 2016 22:12:00 +0000 Attachments: Little_Saint_James_PV_150kW_11.4.16.pdf; GSJ_308kWk_Battery_Bank_Retrofit.pdf Attached are quotes I just quickly reviewed. Assuming lsj price is negotiated to 400k and we save 25 percent of 20,000 monthly lsj bill that is savings of 5k per month and 60k per year. I was told if we cannot use 30 percent federal tax credit they would deduct approx 20 percent off price so assume 320,000 total cost and now payback is 5.25 years. Please advise. Thank you. Richard Kahn HBRK Associates Inc. Begin forwarded message: From: Date: November 4, 2016 at 5:53:40 PM EDT To: "Richard Kahn" Cc: "Lsj Gsj" •, "Kevin Alvarez" • , "Patrick Molesworth" Subject: RE: Re: LSJ - GSJ Solar Hi Rich, Please see the following proposals for a net-metered solar array at LSJ and the battery bank retrofit for GSJ GSJ pricing has been updated with new bulk pricing from Aquion as well as the addition of 4 new battery inverters. I think we should replace them now because the new inverters are supported by Aquion and the older ones are not. The old ones WILL work but for the sake of the entire system I recommend swapping them out now and having a new 5yr warranty in place on the brains of the operation. I had a meeting with Aquion today to go over the final design and they approved the system. GSJ would benefit from more solar panels Brice confirmed your WAPA meter is Commercial so we designed a system sized at 100kW AC / 150kW DC. LSJ can handle 500 modules on all the roofs of the maintenance facility area. This includes the two concrete buildings and the two metal structures. This array should decrease your bill by 25% and requires very little maintenance. Our price is turn-key so everything is included in the price of the contract but we would like to request the use of your barge during the construction process. All materials are in stock and ready to go. Please let me know if you have any questions. Cheers. EFTA00812932 Original Message Subject: RE: Re: LSJ - GSJ Solar From: Date: 11/3/16 1:46 pm To: "Richard Kahn" Cc: "Lsj Gsj" Gentlemen, I can be available for both times so pick one and I will be available. Thank you. Original Message Subject: Re: LSJ - GSJ Solar From: "Richard Kahn" < Date: 11/3/16 1:39 pm To: ' Cc: "Lsj Gsj" Can do 9:30am or 10:45am est Will be on my cell and will need dial in or need to be patched in Richard Kahn HBRK Associates Inc. On Nov 3, 2016, at 1:35 PM, Rich Can you do a 10am EST conference call tomorrow If time does not work, please advise I will not be available between 10-11 am Mountain time Thank you Sent from my iPhone wrote: EFTA00812933

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.