Skip to main content
Skip to content
Case File
efta-efta00817772DOJ Data Set 9Other

DS9 Document EFTA00817772

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00817772
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: Rich Kahn Cc: Jeffrey Epstein <[email protected]>, LSJ GSJ Subject: LSJ SW RO Refurbishment Date: Sat, 05 May 2018 13:02:45 +0000 Attachments: LSJ SW RO Refurb.pdf Rich Attached are proposals from both TSG and GWS (Gemini Water Services) for the refurbishment of the SW RO on LSJ As shown there are Immediate Repairs required Replacement of Control Panels, 75 hp Motor, Pump and Media filter service. This is outside of any work TSG have already been approved for. At this time the RO is operational, but failure of any of the above items would cause the plant to shutdown and the Repair Time would be Lengthy and could lead to water restrictions and or the need to purchase water. The option to Expand the Plant could be done at the same time. My recommendation is to proceed with Gemini Water Services. Can we proceed with finalizing contracts with GWS? regards The Saint .lames Group USVI EFTA00817772

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbishment
Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.