Skip to main content
Skip to content
Case File
efta-efta00817841DOJ Data Set 9Other

From: Larry <MIMI>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00817841
Pages
5
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry <MIMI> To: Je vacation <[email protected]> Subject: Fwd: New Escrow Date: Sat, 17 Sep 2016 11:07:28 +0000 From Husham regarding Damage Sent from my iPad Begin fonvarded message: From: Husham Osman Date: September 17 2016 at 4:17:29 AM EDT To: Larry Visoski Cc: Claire Bru irard , Fahad Wali Subject: Re: New Escrow Dear Larry Good morning to you , Darren Ind ke < >, Ashok Kumar I have explained about difference of TRAX and CAMP system which does not allow us to isolate one aircraft. You kindly understood and requested alternately extracts and Maint history which I have sent before. Please check through my emails of last week and if not available I can forward again. Damage history is vague statement, appreciate if you can further clarify your requirement. Normal operational defects and skin damages occurred in the past which were addressed per OEM documentation rendering the aircraft free of damage and completely airworthy. We can indeed issue a statement to that effect and share with you the aircraft Log Books to prove this. Is that what you are looking for? Regards Husham Sent from my BlackBerry 10 smartphone. From: Larry Visoski Sent: Saturday, 17 September 2016 06:20 To: Husham Osman Cc: Claire Brugirard; Darren Indyke; Ashok Kumar; Fahad Wali Subject: Re: New Escrow Husham Your email was well received, thank you 1-We still require "read Only" access to Traxx maintenance tracking 2- please confirm there is "no Damage History" ? Best regards, Larry PROT0 Sent from my iPhone On Sep 16, 2016, at 10:32 AM, Husham Osman < > wrote: Dear Larry Pease confirm you have answers and attachments to what you need from our side technically in order to proceed. Regarding the original engine it is installed on one of our aircraft currently that is flying with it for a few years. as explained before by ourselves and Capt Brown we do have a stagger program accompanied with engine overhaul program to avoid aircraft long grounding and double engines overhaul. therefore all RJ fleet engines are subject to an engine swap at some point. swapping back is not an option being discussed since it will lead to high cost and complications upon Royal Jet as well as several aircraft grounding and program disturbance. Our understanding is aircraft is sold where is as is with the current engines installed. However once again I do assure you that the engines on the aircraft are very good engines with the following assurance factors: - High EGT margins which is a major contributing factor for deciding on engine health and shop visit. - Long time before shop visits since first LLP is beyond 10,000 cycles (aircraft engines are at around 4,000 and 2000 cycles). - N01 engine already had performance restoration plus Turbine Rear Frame modification to correct a CFMS6-7 design issue experienced on many engines and requires shop visit to modify. This one is done so you will never have to do this mod. Spec sent to you by Claire is ok except for the hours that needs to be updated. my last email to you had the latest tech log hours. next week after everyone is back from the Eid break we will do a calculation check for the last few weeks as an extra reassurance for you and correct any tech log airframe hour errors if any. For now the figures I have sent do stand. As for Final APU, Airframe and Engines hours cycles I suggest one more update at the time of APA finalization since the aircraft is operating still until sold. Thank you Larry for your time and I do hope you have the necessary technical info needed for this stage. surely next phase will require further coordination which we would be happy to engage on once the relevant agreements are signed by both parties. Best Regards Husham From: Larry Visoski < Sent: Thursday, September 15, 2016 12:04 AM To: Claire Brugirard; Husham Osman Cc: Darren Indyke Subject: Fwd: New Escrow Hello Claire, Darren awaits the answers to the email below, so he may present the purchase agreement. We also need a correct spec sheet to attach to the purchase Agreement as well, PROT1 See questions below, Best regards, Larry Sent from my iPhone Begin forwarded message: From: Larry Visoski Date: September 12, 2016 at 7:50:09 PM EDT To: Claire Brugirard Husham Osman c Subject: Re: New Escrow Good Day Claire and Husham, Sorry for delay , I was having technical issue. In order to present and Accurate Purchase agreement, could you assist with these questions: 1-Where is the original engine located? Please provide details why it was removed? could you provide engine serial numbers, total time and cycles for engines that are currently installed on DFR? (original spec sheet you provided indicated 4400 and 12000 hour total times on engines). 2-Airframe total time and cycles? 3-APU total time and cycles to include serial number? 4-confirm the aircraft has no damage history both airframe and Engines? 5- I await Cl inspection package from Mr. Osman. Best regards, Larry Visoski Sent from my iPhone On Sep 12, 2016, at 3:40 PM, Claire Brugirard tz > wrote: Thanks for the update Darren Best Regards, Claire Brugirard From: Darren Indyke Sent: Monday, September 12, 2016 19:45 To: Claire Brugirard Cc: Larry Subject: Re: New Escrow PROT2 Good day, Claire. Thank you for your email. I am working on the draft agreement presently. I am hoping to send it to you by tomorrow or sooner if possible. Best, DARREN K. INDYKE DARREN K. INDYKE, PLLC 575 Lexington Avenue, 4th Floor New York, New York 10022 The information contained in this communication is confidential, may be attorney-client privileged, and is intended only for the use of the addressee. It is the property of Darren K. Indyke, PLLC. Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail, and destroy this communication and all copies thereof, including all attachments. Copyright of Darren K. Indyke, PLLC - © 2016 Darren K. Indyke, PLLC - All rights reserved. On Sep 11, 2016, at 2:09 PM, Claire Brugirard > wrote: Dear Darren I believe our next step is to review and agree on the draft purchase agreement. As per the 101 the purchaser shall provide this draft. Has there been any progress with this on your side? Many thanks Best Regards, Chirp Brugirard From: Darren Indyke Sent: Wednesday, September 7, 2016 14:30 To: Claire Brugirard Cc: Larry Subject: Fwd: New Escrow Claire, PROT3 I have asked AIC to send you a separate confirmation but please see the deposit confirmation from AIC below. Plan D, LLC will be the entity that actually takes title to the Aircraft at closing. It is owned by the same owner as Thomas World Air, LLC so I had it wire the Deposit to AIC. Thanks. Regards. Darren Sent from my iPhone Begin forwarded message: From: T Bear Date: September 6. 2016 at 7:06:30 PM EDT To: Darren Indyke < Subject: RE: New Escrow Hi Darren, The deposit was received late this afternoon. This will confirm receipt of a $1,000,000.00 deposit from Plan D LLC referencing Sn. 30884. I look forward to working with you again. Thanks! Tammi Bear Escrow Agent AIC Title Service, LLC <image001.png> AIC is excited to announce the addition of an Appraisal Department. Call us for all of your Aircraft Appraisal needs. As with any large purchase or loan, TITLE INSURANCE is available to protect your interest for a one time premium. We carrym$40 Million Bond and an E&O Certificate of $1 Million for your protection. This email and any attachments ("Message") may contain legally privileged and/or confidential information. If you are not the addressee, or if this Message has been addressed to you in error, you are not authorized to read, copy, or distribute it, and we ask that you please delete it (including all copies) and notify the sender by return email. Delivery of this Message to any person other than the intended recipient(s) shall not be deemed a waiver of confidentiality and/or a privilege. PROT4

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Tail #N01
Wire Refreferencing

Related Documents (6)

DOJ Data Set 9OtherUnknown

July 30, 2021 David Rodgers prep VTC

July 30, 2021 David Rodgers prep VTC Attorney Quigley Prepared for trial testimony. • Currently retired, formerly worked as a pilot. • Employer from 1991 through 2019 was Jeffrey Epstein, though was paid by NES corp o First 13 years, was chief pilot o Remainder was the captain and flight engineer • First hired in approximately July 1991 by JE o DR was flying for a real estate developer in Columbus, Ohio, and aviation manager next door worked for Les Wexner and suggested DR might be interested in flying for Jeffrey because he was getting same airplane DR was flying. o DR said he was interested, the aviation manager set up interview, DR met with Jeffrey, and was hired • Job responsibilities as chief pilot: o Flying the plane o Budgeting to paying bills so we would know how much money we would need for the planes, bills for maintenance o Scheduling maintenance o Recording flight logs • Responsibilities as captain and flight engineer: o Flying the plane o Captain

7p
DOJ Data Set 9OtherUnknown

From: Daphne Wallace <

1p
DOJ Data Set 9OtherUnknown

From: Larry Visoski

1p
DOJ Data Set 9OtherUnknown

Subject: NY Friday

1p
Court UnsealedSep 9, 2019

Epstein Depositions

10. 11. 12. l3. 14. 16. 17. l8. 19. Jeffrey Epstein v. Bradley J. Edwards, et Case No.: 50 2009 CA Attachments to Statement of Undisputed Facts Deposition of Jeffrey Epstein taken March 17, 2010 Deposition of Jane Doe taken March 11, 2010 (Pages 379, 380, 527, 564?67, 568) Deposition of LM. taken September 24, 2009 (Pages 73, 74, 164, 141, 605, 416) Deposition ofE.W. taken May 6, 2010 (1 15, 1.16, 255, 205, 215?216) Deposition of Jane Doe #4 (32-34, 136) Deposition of Jeffrey Eps

839p
DOJ Data Set 9OtherUnknown

From: Lesley Groff

8p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.