Skip to main content
Skip to content
Case File
efta-efta00901929DOJ Data Set 9Other

From: "Gary Kerney"

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00901929
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Gary Kerney" To: "Jeffrey Epstein" <[email protected]> Cc: "William Rowles" < , >, Subject: Schedule Date: Thu, 13 Jan 2011 21:09:03 +0000 CONSTRUCTION Schedule Status Jan.13th Kitchen inside ready by Feb.5 Exceptions banquette drawers outside Exceptions wall sconces on columns handrails in progress exterior painting being finished up Master suite bedroom ready for furniture by Jan.21 Bath ready for Feb.5 Exceptions temp tops and sinks on vanities glass walls pair of arched doors should be delivered about the 5th the outside tub will take til the 10th the stair walls will be very close to done bedroom road should start by the 5th little office floors,material will arrive week of the 20th.will try to get in by the 5th pending labor to get it down Mechinical buildings will be in operation April 7 Exceptions decomminisioning of old plant area site work as part of the new and old complex work assioated with the roof function ready for decorative painting EFTA00901929

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.