Skip to main content
Skip to content
Case File
efta-efta00903425DOJ Data Set 9Other

From: Jeffrey Epstein <[email protected]>

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00903425
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Jeffrey Epstein <[email protected]> To: Tom Sze Subject: Re: Pool Plan Studies G-7 Date: Sat, 29 Jan 2011 00:32:46 +0000 the stairs are not nice, lets try something else. it ruins the line that we have tried so hard to maintain„ there is no spa? we can go further east for mechanicalls no reason to dig On Sat, Jan 29, 2011 at 1:21 AM, Tom Sze < > wrote: Jeffrey, Here are two options for the pool based on our conversation yesterday when I called you in Paris. G-7A: The mezzanine has been taken out. Two sets of doors symmetrically placed on the north wall. Entry into the pool room will be through these doors. Stair option going from +57' above all the way down to +38' below. Shower room is now at the southeast corner with a possible view out. ( We need to verify this with the existing topography ) The Pool equipment room is now at the southwest corner. ( Fresh sir intake for HVAC and access could be a problem here ) G-7B: Same exact pool plan with the mezzanine taken out. Another stair option going down to the +38' level at the northwest corner. Introduction of a "Patio" at the entrances to the pool with the vehicle drop-off between the doors. This is a much better transition from the pool to the exterior and gives us a buffer to the road. Additional mechanical/pool equipment space to the south of the shower. ( we need to verify topography here ) Please review and get back to us with your comments. Again, if you would like to bring back the cascading stairs off of the screening room patio, We will more than happy to redesign them back in. just let us know. EFTA00903425 Thanks and have a nice weekend. Tom Tom Sze, AIA Senior Associate Direct Main Mobile Gensler 2500 Broadway Suite 300 Santa Monica California 90404 USA *********************************************************** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00903426

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.