Skip to main content
Skip to content
Case File
efta-efta00933451DOJ Data Set 9Other

DS9 Document EFTA00933451

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00933451
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: Cc: Subject: Date: Attachments: brice gordon Jeffrey Epstein <[email protected]> LSJ Re: Fri, 06 Apr 2012 22:52:47 +0000 Metal Shed06042012_00000.jpg; Metal_Shed06042012 00001.jpg; Metal Shed06042012_00002.jpg; Metal_Shed06042012_00003.jpg; Metal Shed06042012_00004.jpg; Metal_Shed06042012_00005.jpg; Metal Shed06042012_00006.jpg; Metal_Shed06042012_00007.jpg; Metal Shed06042012_00008.jpg; Metal Shed06042012 00009.jpg as request, proposed metal shed drawings, these have not been finalized yet. Tom and I will be meeting with ABC on Tuesday to go over drawing and erection schedule etc Awaiting proposal for Roll up doors, and 2 double man doors which will go on the end of the building. These are not shown in drawing I would recommend that we just lay a thick layer of gravel around Engineering area due to the fact that Track Equipment will be stored and maintained there. Library, unit was installed Thursday, will be checking humidity levels tomorrow. Office Temperature, both the outlet and return ducts in the bathroom and kitchen do not have in line dampers, which allows to much cool air to these spaces. Design fault. Have restricted air flow to these spaces, by placing a piece of cardboard in ducting seemed to be maintainiamp at this time. Will have ARS put together proposal for in line dampers controlled by thermostat in office Will show Tom site for generator for Five Palms, we should be able to run copper, switch gear etc in house. Will speak with Danny Vicars about material costs Tuesday Will forward Gliddens review for alternative route from Flag Pool Santa Fe I expect to have the following proposal by the end of the week, Stucco, Phone, Internet Upgrade, Landscaping, Terraces, Working on Well drilling bids, Plan to meet with Casey Cook & Frank Bond when on sight to discuss water distribution/usage vs permit conditions I have Contacted an Agency regarding search couple for the Ranch and a Chef, so I may have interviews as well. There fee is $375 to start, then 20% of Gross Salary, would you be ok with 15% of gross salary Next week I really wish to hammer out schedule with Tom, plus all the other items on the to list before heading out again. Thank you for the offer. On Fri, Apr 6, 2012 at 3:33 PM, Jeffrey Epstein <[email protected]> wrote: please send me the proposed plans for the steel shed? wher are we with the library,? electric for five palms , and the list of sfe to dos.. when do you want to go.. I will leave now on the 11th , and karen and you are welcome to come to ny EFTA00933451 *********************************************************** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected] and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved Brice Cordon Little Saint James USVI Phone: EFTA00933452

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone6042012

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.